A Case Study of Recovery Construction Projects in Mountainous Area in Nantou, Taiwan

碩士 === 朝陽科技大學 === 營建工程系 === 107 === This research is for post disaster reconstruction work and its performance in Taiwan mountain area. Discussing the method for reconstruction, the performance and the notices to investigate the reason and solution for mountain post disaster at Nantou and suggest fo...

Full description

Bibliographic Details
Main Authors: HU, CHIA-HSUN, 胡家訓
Other Authors: CHANG, TZYY-SHIOU
Format: Others
Language:zh-TW
Published: 2019
Online Access:http://ndltd.ncl.edu.tw/handle/nn58wm
id ndltd-TW-106CYUT0512032
record_format oai_dc
spelling ndltd-TW-106CYUT05120322019-11-09T05:23:19Z http://ndltd.ncl.edu.tw/handle/nn58wm A Case Study of Recovery Construction Projects in Mountainous Area in Nantou, Taiwan 台灣南投山區泰利颱風災修復建工程案例探討 HU, CHIA-HSUN 胡家訓 碩士 朝陽科技大學 營建工程系 107 This research is for post disaster reconstruction work and its performance in Taiwan mountain area. Discussing the method for reconstruction, the performance and the notices to investigate the reason and solution for mountain post disaster at Nantou and suggest four reconstruction methods. The authority decides the simple and easy reconstruction that will be shorter reconstruction time, not influence the traffic and transportation for agriculture products. This method ran pretty well after several times hitting of heavy rains and no more serious disaster. This research case project was set up to set up water wells and water cushions to accelerate the elimination of surface water; set retaining foundation table, block guardrail, submerged dam and rail pile to protect roadside slope from further damage; then lay 20 cm thick ready-mixed concrete pavement to prevent the roadbed from being damaged, and set up a longitudinal ditches and drainage blind pipes to accelerate a large amount of surface water to discharge the affected sections. Through this case, there are some advantages, disadvantages and the improvements discussing. The main reasons for road base sink after heavy rains at part of mountain area are saturated soil, hollow road base, failure drainage system and others. The authority can make file for the finished cases, build the monitor system, with sufficient budget, participate in the concept of sustainable development to improve the operational efficiency, and use steel bridges to replace concrete bridges, to avoid floods and rushing to attack the bridge pier and other suggestions, hope to provide reference for post-disaster reconstruction projects. Keywords: typhoon, Nantou, mountain disaster, reconstruction CHANG, TZYY-SHIOU 張子修 2019 學位論文 ; thesis 66 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 朝陽科技大學 === 營建工程系 === 107 === This research is for post disaster reconstruction work and its performance in Taiwan mountain area. Discussing the method for reconstruction, the performance and the notices to investigate the reason and solution for mountain post disaster at Nantou and suggest four reconstruction methods. The authority decides the simple and easy reconstruction that will be shorter reconstruction time, not influence the traffic and transportation for agriculture products. This method ran pretty well after several times hitting of heavy rains and no more serious disaster. This research case project was set up to set up water wells and water cushions to accelerate the elimination of surface water; set retaining foundation table, block guardrail, submerged dam and rail pile to protect roadside slope from further damage; then lay 20 cm thick ready-mixed concrete pavement to prevent the roadbed from being damaged, and set up a longitudinal ditches and drainage blind pipes to accelerate a large amount of surface water to discharge the affected sections. Through this case, there are some advantages, disadvantages and the improvements discussing. The main reasons for road base sink after heavy rains at part of mountain area are saturated soil, hollow road base, failure drainage system and others. The authority can make file for the finished cases, build the monitor system, with sufficient budget, participate in the concept of sustainable development to improve the operational efficiency, and use steel bridges to replace concrete bridges, to avoid floods and rushing to attack the bridge pier and other suggestions, hope to provide reference for post-disaster reconstruction projects. Keywords: typhoon, Nantou, mountain disaster, reconstruction
author2 CHANG, TZYY-SHIOU
author_facet CHANG, TZYY-SHIOU
HU, CHIA-HSUN
胡家訓
author HU, CHIA-HSUN
胡家訓
spellingShingle HU, CHIA-HSUN
胡家訓
A Case Study of Recovery Construction Projects in Mountainous Area in Nantou, Taiwan
author_sort HU, CHIA-HSUN
title A Case Study of Recovery Construction Projects in Mountainous Area in Nantou, Taiwan
title_short A Case Study of Recovery Construction Projects in Mountainous Area in Nantou, Taiwan
title_full A Case Study of Recovery Construction Projects in Mountainous Area in Nantou, Taiwan
title_fullStr A Case Study of Recovery Construction Projects in Mountainous Area in Nantou, Taiwan
title_full_unstemmed A Case Study of Recovery Construction Projects in Mountainous Area in Nantou, Taiwan
title_sort case study of recovery construction projects in mountainous area in nantou, taiwan
publishDate 2019
url http://ndltd.ncl.edu.tw/handle/nn58wm
work_keys_str_mv AT huchiahsun acasestudyofrecoveryconstructionprojectsinmountainousareainnantoutaiwan
AT hújiāxùn acasestudyofrecoveryconstructionprojectsinmountainousareainnantoutaiwan
AT huchiahsun táiwānnántóushānqūtàilìtáifēngzāixiūfùjiàngōngchéngànlìtàntǎo
AT hújiāxùn táiwānnántóushānqūtàilìtáifēngzāixiūfùjiàngōngchéngànlìtàntǎo
AT huchiahsun casestudyofrecoveryconstructionprojectsinmountainousareainnantoutaiwan
AT hújiāxùn casestudyofrecoveryconstructionprojectsinmountainousareainnantoutaiwan
_version_ 1719288734862540800