The Research of Implementing Total Produce Management - An Empirical Case Study

碩士 === 中原大學 === 企業管理研究所 === 106 === With the Enterprises a lack of innovation in human resources, experience, and technological capabilities. Therefore, the use of internal human resources and reduce waste of resources within the enterprise, give full play to the effectiveness of enterprises is a cr...

Full description

Bibliographic Details
Main Authors: Da-Wei Lin, 林大為
Other Authors: Shih-Hsien Tseng
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/p5b2t5
id ndltd-TW-106CYCU5121064
record_format oai_dc
spelling ndltd-TW-106CYCU51210642019-10-31T05:22:11Z http://ndltd.ncl.edu.tw/handle/p5b2t5 The Research of Implementing Total Produce Management - An Empirical Case Study TPM模式建置之研究與實證個案分析 Da-Wei Lin 林大為 碩士 中原大學 企業管理研究所 106 With the Enterprises a lack of innovation in human resources, experience, and technological capabilities. Therefore, the use of internal human resources and reduce waste of resources within the enterprise, give full play to the effectiveness of enterprises is a crucial issue. Previous TPM studies focused on the automotive industry, household electrical appliance industry, semiconductor industry, electrical parts industry, while electrical wire and cable Industry issues were neglected. Total Productive Maintenance (TPM) promoted by Hsinchuang plant lagged behind and the activity itself was not perfect. Therefore, there is no obvious result in the enhancement of personnel, technology, and equipment. Equipment has been 30 years, manufacturers provide the standards, technical units responsible for the scheduling, the production unit is responsible for the implementation. However, the long-term use of production equipment, improvement, renovation, the inspection, maintenance, lubrication, aging equipment cannot lead to the best use. The company''s activities are linked with the work of the engineering unit. In addition, in 2017, the Labor Department started one implementation one fixed day off and one flexible rest day, 46 hours overtime. According to the current manpower and equipment configuration in the factory, the TPM is suitable for the current situation. Therefore, this study mainly focuses on the implementation of TPM activities in W Company and the establishment of standards. This study discusses the personnel, equipment and production status during the execution of the activity. Employee Participation and Visual Management to reduce the seven major waste, and enhance the value. Finally, the study provides suggestions for researchers and industry. Shih-Hsien Tseng 曾世賢 2018 學位論文 ; thesis 68 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 中原大學 === 企業管理研究所 === 106 === With the Enterprises a lack of innovation in human resources, experience, and technological capabilities. Therefore, the use of internal human resources and reduce waste of resources within the enterprise, give full play to the effectiveness of enterprises is a crucial issue. Previous TPM studies focused on the automotive industry, household electrical appliance industry, semiconductor industry, electrical parts industry, while electrical wire and cable Industry issues were neglected. Total Productive Maintenance (TPM) promoted by Hsinchuang plant lagged behind and the activity itself was not perfect. Therefore, there is no obvious result in the enhancement of personnel, technology, and equipment. Equipment has been 30 years, manufacturers provide the standards, technical units responsible for the scheduling, the production unit is responsible for the implementation. However, the long-term use of production equipment, improvement, renovation, the inspection, maintenance, lubrication, aging equipment cannot lead to the best use. The company''s activities are linked with the work of the engineering unit. In addition, in 2017, the Labor Department started one implementation one fixed day off and one flexible rest day, 46 hours overtime. According to the current manpower and equipment configuration in the factory, the TPM is suitable for the current situation. Therefore, this study mainly focuses on the implementation of TPM activities in W Company and the establishment of standards. This study discusses the personnel, equipment and production status during the execution of the activity. Employee Participation and Visual Management to reduce the seven major waste, and enhance the value. Finally, the study provides suggestions for researchers and industry.
author2 Shih-Hsien Tseng
author_facet Shih-Hsien Tseng
Da-Wei Lin
林大為
author Da-Wei Lin
林大為
spellingShingle Da-Wei Lin
林大為
The Research of Implementing Total Produce Management - An Empirical Case Study
author_sort Da-Wei Lin
title The Research of Implementing Total Produce Management - An Empirical Case Study
title_short The Research of Implementing Total Produce Management - An Empirical Case Study
title_full The Research of Implementing Total Produce Management - An Empirical Case Study
title_fullStr The Research of Implementing Total Produce Management - An Empirical Case Study
title_full_unstemmed The Research of Implementing Total Produce Management - An Empirical Case Study
title_sort research of implementing total produce management - an empirical case study
publishDate 2018
url http://ndltd.ncl.edu.tw/handle/p5b2t5
work_keys_str_mv AT daweilin theresearchofimplementingtotalproducemanagementanempiricalcasestudy
AT líndàwèi theresearchofimplementingtotalproducemanagementanempiricalcasestudy
AT daweilin tpmmóshìjiànzhìzhīyánjiūyǔshízhènggèànfēnxī
AT líndàwèi tpmmóshìjiànzhìzhīyánjiūyǔshízhènggèànfēnxī
AT daweilin researchofimplementingtotalproducemanagementanempiricalcasestudy
AT líndàwèi researchofimplementingtotalproducemanagementanempiricalcasestudy
_version_ 1719283923686522880