The Research of Optimization of Production Planning and Scheduling for Steel Bar -- a Case Study of W Company
碩士 === 中原大學 === 企業管理研究所 === 106 === To face the new trend challenge that the local distributors plan to transform themselves to manufacturers and, at the same time, the threat of competitors over the world that expand their production dramatically, a research based on W company to establish new mode...
Main Authors: | Jia-Ling Xie, 謝佳玲 |
---|---|
Other Authors: | Shih-Hsien Tseng |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/4386fg |
Similar Items
-
Studying the Optimal Production and Schedule of Galvanized Steel Sheet-an Example Research of YIEHPHUI Company
by: Liang-lin Yang, et al.
Published: (2007) -
Using Particle Swarm Optimization to Plan of Cutting Steel Bars
by: Kung-Ting Li, et al.
Published: (2007) -
Improved Constraint Handling in Optimization of Steel Bar Cutting Plan
by: Shang-bin Chien, et al.
Published: (2009) -
The Evaluation of Choices and the Entry Modes for Southeast Asia Market of Stainless Steel Bar Product - a Case Study of W Company
by: Chao-Yang Zheng, et al.
Published: (2018) -
Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production
by: Huawei Yuan, et al.
Published: (2013-01-01)