System Integration Approach for APS- A Case Study of T Corporation

碩士 === 元智大學 === 資訊管理學系 === 105 === With reference to the abovementioned situation, this study will take an example of a Copper Clad Laminate (CCL) manufacturing schedule for further discussion. As far as the current manufacturing system is concerned, the enterprise has to well control the incomi...

Full description

Bibliographic Details
Main Authors: Cheng-Hui Chiang, 江政輝
Other Authors: Yi-Chuan Lu
Format: Others
Language:zh-TW
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/3nfzsw
id ndltd-TW-105YZU05396031
record_format oai_dc
spelling ndltd-TW-105YZU053960312019-05-15T23:32:34Z http://ndltd.ncl.edu.tw/handle/3nfzsw System Integration Approach for APS- A Case Study of T Corporation APS系統整合之探討-以T公司為例 Cheng-Hui Chiang 江政輝 碩士 元智大學 資訊管理學系 105 With reference to the abovementioned situation, this study will take an example of a Copper Clad Laminate (CCL) manufacturing schedule for further discussion. As far as the current manufacturing system is concerned, the enterprise has to well control the incoming raw materials, making good coordination in process and well adjust the production capacity in order to immediately and accurately respond to customers’ requirements while facing changeable markets environment and production sites. Advanced Planning and Scheduling System (APS) is considered as an effective management tool for production, marketing and quality control. This tool may give enterprise a well comprehensive picture of materials distribution and analysis of production load on site. It allows an enterprise to have appropriate scheduling under limited capacity condition so that making the enterprise to achieve maximum capacity with minimum costs. Yi-Chuan Lu 盧以詮 2017 學位論文 ; thesis 39 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 元智大學 === 資訊管理學系 === 105 === With reference to the abovementioned situation, this study will take an example of a Copper Clad Laminate (CCL) manufacturing schedule for further discussion. As far as the current manufacturing system is concerned, the enterprise has to well control the incoming raw materials, making good coordination in process and well adjust the production capacity in order to immediately and accurately respond to customers’ requirements while facing changeable markets environment and production sites. Advanced Planning and Scheduling System (APS) is considered as an effective management tool for production, marketing and quality control. This tool may give enterprise a well comprehensive picture of materials distribution and analysis of production load on site. It allows an enterprise to have appropriate scheduling under limited capacity condition so that making the enterprise to achieve maximum capacity with minimum costs.
author2 Yi-Chuan Lu
author_facet Yi-Chuan Lu
Cheng-Hui Chiang
江政輝
author Cheng-Hui Chiang
江政輝
spellingShingle Cheng-Hui Chiang
江政輝
System Integration Approach for APS- A Case Study of T Corporation
author_sort Cheng-Hui Chiang
title System Integration Approach for APS- A Case Study of T Corporation
title_short System Integration Approach for APS- A Case Study of T Corporation
title_full System Integration Approach for APS- A Case Study of T Corporation
title_fullStr System Integration Approach for APS- A Case Study of T Corporation
title_full_unstemmed System Integration Approach for APS- A Case Study of T Corporation
title_sort system integration approach for aps- a case study of t corporation
publishDate 2017
url http://ndltd.ncl.edu.tw/handle/3nfzsw
work_keys_str_mv AT chenghuichiang systemintegrationapproachforapsacasestudyoftcorporation
AT jiāngzhènghuī systemintegrationapproachforapsacasestudyoftcorporation
AT chenghuichiang apsxìtǒngzhěnghézhītàntǎoyǐtgōngsīwèilì
AT jiāngzhènghuī apsxìtǒngzhěnghézhītàntǎoyǐtgōngsīwèilì
_version_ 1719150575283601408