Analysis of Jacking force for EPB

碩士 === 國立臺北科技大學 === 土木工程系土木與防災碩士班 === 105 === Earth Pressure Balance system is a method which uses the combination of exca-vated soil material and impermeable bentonite stabilizing solution in order to provide stability at the cutting face of the EPB machine. The excavated material is then pumped to...

Full description

Bibliographic Details
Main Authors: Yi-Zhi Cai, 蔡佾志
Other Authors: P.E., Shong-loong Chen Ph.D.
Format: Others
Language:zh-TW
Online Access:http://ndltd.ncl.edu.tw/handle/xrxkej
id ndltd-TW-105TIT05653013
record_format oai_dc
spelling ndltd-TW-105TIT056530132019-05-15T23:53:22Z http://ndltd.ncl.edu.tw/handle/xrxkej Analysis of Jacking force for EPB 土壓平衡式推管工法的元押推進力探討 Yi-Zhi Cai 蔡佾志 碩士 國立臺北科技大學 土木工程系土木與防災碩士班 105 Earth Pressure Balance system is a method which uses the combination of exca-vated soil material and impermeable bentonite stabilizing solution in order to provide stability at the cutting face of the EPB machine. The excavated material is then pumped to the ground surface using mud tubes for muck removal and separation. In addition, this method uses a close circuit system which allows the bentonite solution to be circulated through a water treatment equipment and reused by the EPB machine. Operation of the EPB machine requires many years of experience to determine any sudden deviation or changes in soil material during pipe jacking, such as driftwood, boulders, composite sites and even trash during the advancing process. It is very important during the operation of pipe jacking that sufficient knowledge of the geology and type of soil on site is known, the appropriate aperture and cutting tools needed and mostly importantly to determine what the cutting head face will encounter due to the soil type. Moreover, during the jacking process the operators knowledge and experience will allow at any time for quick response to make necessary adjustment such as regulation of advancement speed and change of slurry discharge speed due to geological changes on site. In this study, three gravel layer were selected and the data of each pipe were recorded for the process of pipe jacking. The data collected were the soil type, the deviation and stability of tunnel and other local factors which may affect the total thrust force. P.E., Shong-loong Chen Ph.D. James C. Ni Ph.D. 陳水龍博士 倪至寬博士 學位論文 ; thesis 183 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺北科技大學 === 土木工程系土木與防災碩士班 === 105 === Earth Pressure Balance system is a method which uses the combination of exca-vated soil material and impermeable bentonite stabilizing solution in order to provide stability at the cutting face of the EPB machine. The excavated material is then pumped to the ground surface using mud tubes for muck removal and separation. In addition, this method uses a close circuit system which allows the bentonite solution to be circulated through a water treatment equipment and reused by the EPB machine. Operation of the EPB machine requires many years of experience to determine any sudden deviation or changes in soil material during pipe jacking, such as driftwood, boulders, composite sites and even trash during the advancing process. It is very important during the operation of pipe jacking that sufficient knowledge of the geology and type of soil on site is known, the appropriate aperture and cutting tools needed and mostly importantly to determine what the cutting head face will encounter due to the soil type. Moreover, during the jacking process the operators knowledge and experience will allow at any time for quick response to make necessary adjustment such as regulation of advancement speed and change of slurry discharge speed due to geological changes on site. In this study, three gravel layer were selected and the data of each pipe were recorded for the process of pipe jacking. The data collected were the soil type, the deviation and stability of tunnel and other local factors which may affect the total thrust force.
author2 P.E., Shong-loong Chen Ph.D.
author_facet P.E., Shong-loong Chen Ph.D.
Yi-Zhi Cai
蔡佾志
author Yi-Zhi Cai
蔡佾志
spellingShingle Yi-Zhi Cai
蔡佾志
Analysis of Jacking force for EPB
author_sort Yi-Zhi Cai
title Analysis of Jacking force for EPB
title_short Analysis of Jacking force for EPB
title_full Analysis of Jacking force for EPB
title_fullStr Analysis of Jacking force for EPB
title_full_unstemmed Analysis of Jacking force for EPB
title_sort analysis of jacking force for epb
url http://ndltd.ncl.edu.tw/handle/xrxkej
work_keys_str_mv AT yizhicai analysisofjackingforceforepb
AT càiyìzhì analysisofjackingforceforepb
AT yizhicai tǔyāpínghéngshìtuīguǎngōngfǎdeyuányātuījìnlìtàntǎo
AT càiyìzhì tǔyāpínghéngshìtuīguǎngōngfǎdeyuányātuījìnlìtàntǎo
_version_ 1719156459960270848