Use and Discussion of Pipe Umbrella Roofing and TSP in Construction of NATM
碩士 === 國立臺北科技大學 === 土木工程系土木與防災碩士班(碩士在職專班) === 105 === The main theme of this paper is research and discussion of tunnel construction by the New Austrian Tunneling Method (hereinafter referred to as NATM) accompanied with the Pipe Umbrella Roofing method, Tunnel Seismic Prediction method (hereinafter...
Main Authors: | Tai-Yi Liu, 劉泰儀 |
---|---|
Other Authors: | Shong-Loong Chen |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/5a3jnb |
Similar Items
-
Analysis of Production Rate for NATM Tunneling Construction
by: Meng-Chieh Lin, et al.
Published: (2003) -
Deformation of The Soil Tunnel by the NATM
by: Che-Chun Su, et al.
Published: (2008) -
Conception and Exploration of Using Data as a Service in Tunnel Construction with the NATM
by: Bowen Du, et al.
Published: (2018-02-01) -
Useful concepts for application of new Austrian tunnelling method in tunnel construction (NATM)
by: Jovčlć Vojkan, et al.
Published: (2015-01-01) -
Soft Ground Tunnelling with NATM Method
by: Ko, Ching-Joe, et al.
Published: (1997)