BIM Application for Identification and Elimination of Electrical and Mechanical Conflicts in Building Construction
碩士 === 國立臺灣大學 === 土木工程學研究所 === 105 === A building will not be completed without the mechanical, electrical and plumbing (MEP) system. The mechanical and electrical systems are to the construction as organs are to the human body, and the plumbing systems which build up the connections are the nerves...
Main Authors: | Jyun-Yu Chen, 陳俊宇 |
---|---|
Other Authors: | Sy-Jye Guo |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/tq33b3 |
Similar Items
-
Application of BIM on construction of building foundation
by: Lin, Jing-Sheng, et al.
Published: (2013) -
Problem Identification and Quality Improvement of BIM models for Building Construction Projects
by: Chen-Da Heng, et al.
Published: (2019) -
BIM for Integration of Building and Mechanical &;Electrical Systems Benefits
by: HO,KUAN-HSUN, et al. -
Research on the Application Value of BIM in Building Construction
by: Shixia Duan, et al.
Published: (2021-01-01) -
Soft-Conflict Detection in Building Construction Stage Using BIM and Schedule Information
by: Jeong-Shing Lee, et al.
Published: (2013)