Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment
碩士 === 國立屏東科技大學 === 工業管理系所 === 105 === In this work we consider the order delivery, new materials, recycling of recycled materials and a recyclable remanufacturing system. The proposed model evaluates cost-effectiveness while integrating multiple products, multiple suppliers, multiple components a...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/6qaqbf |
id |
ndltd-TW-105NPUS5041009 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-105NPUS50410092019-05-16T00:00:24Z http://ndltd.ncl.edu.tw/handle/6qaqbf Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment 考量交期與模糊環境下之多產品可回收再製造決策 Cheng, Ya-Chi 鄭雅綺 碩士 國立屏東科技大學 工業管理系所 105 In this work we consider the order delivery, new materials, recycling of recycled materials and a recyclable remanufacturing system. The proposed model evaluates cost-effectiveness while integrating multiple products, multiple suppliers, multiple components and multiple machines for a remanufacturing system. Decision-makers can use the analytical results of this work to improve their understanding of the cost-effectiveness of recyclable remanufacturing planning. However, the remanufacturing production planning problems and related mathematical programming methods are unsuitable to yield an effective solution because of the conflicting nature of multiple objectives and related parameters. In this work, the fuzzy multi-objective linear programming mode with an interactive two-phase possibilistic linear programming approach is employed for solving the remanufacturing production system decision problems with multiple goals in a fuzzy environment. The analytical results presented in this work can help decision-makers to better understand the systematic analysis, potential for cost-effectiveness and the number of losses in a recoverable remanufacturing environment. Su, Tai-Sheng 蘇泰盛 2017 學位論文 ; thesis 69 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立屏東科技大學 === 工業管理系所 === 105 === In this work we consider the order delivery, new materials, recycling of recycled materials and a recyclable remanufacturing system. The proposed model evaluates cost-effectiveness while integrating multiple products, multiple suppliers, multiple components and multiple machines for a remanufacturing system. Decision-makers can use the analytical results of this work to improve their understanding of the cost-effectiveness of recyclable remanufacturing planning. However, the remanufacturing production planning problems and related mathematical programming methods are unsuitable to yield an effective solution because of the conflicting nature of multiple objectives and related parameters. In this work, the fuzzy multi-objective linear programming mode with an interactive two-phase possibilistic linear programming approach is employed for solving the remanufacturing production system decision problems with multiple goals in a fuzzy environment. The analytical results presented in this work can help decision-makers to better understand the systematic analysis, potential for cost-effectiveness and the number of losses in a recoverable remanufacturing environment.
|
author2 |
Su, Tai-Sheng |
author_facet |
Su, Tai-Sheng Cheng, Ya-Chi 鄭雅綺 |
author |
Cheng, Ya-Chi 鄭雅綺 |
spellingShingle |
Cheng, Ya-Chi 鄭雅綺 Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment |
author_sort |
Cheng, Ya-Chi |
title |
Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment |
title_short |
Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment |
title_full |
Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment |
title_fullStr |
Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment |
title_full_unstemmed |
Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment |
title_sort |
recoverable remanufacturing decisions of multiple products with delivery date and fuzzy environment |
publishDate |
2017 |
url |
http://ndltd.ncl.edu.tw/handle/6qaqbf |
work_keys_str_mv |
AT chengyachi recoverableremanufacturingdecisionsofmultipleproductswithdeliverydateandfuzzyenvironment AT zhèngyǎqǐ recoverableremanufacturingdecisionsofmultipleproductswithdeliverydateandfuzzyenvironment AT chengyachi kǎoliàngjiāoqīyǔmóhúhuánjìngxiàzhīduōchǎnpǐnkěhuíshōuzàizhìzàojuécè AT zhèngyǎqǐ kǎoliàngjiāoqīyǔmóhúhuánjìngxiàzhīduōchǎnpǐnkěhuíshōuzàizhìzàojuécè |
_version_ |
1719158280703442944 |