Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment

碩士 === 國立屏東科技大學 === 工業管理系所 === 105 ===   In this work we consider the order delivery, new materials, recycling of recycled materials and a recyclable remanufacturing system. The proposed model evaluates cost-effectiveness while integrating multiple products, multiple suppliers, multiple components a...

Full description

Bibliographic Details
Main Authors: Cheng, Ya-Chi, 鄭雅綺
Other Authors: Su, Tai-Sheng
Format: Others
Language:zh-TW
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/6qaqbf
id ndltd-TW-105NPUS5041009
record_format oai_dc
spelling ndltd-TW-105NPUS50410092019-05-16T00:00:24Z http://ndltd.ncl.edu.tw/handle/6qaqbf Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment 考量交期與模糊環境下之多產品可回收再製造決策 Cheng, Ya-Chi 鄭雅綺 碩士 國立屏東科技大學 工業管理系所 105   In this work we consider the order delivery, new materials, recycling of recycled materials and a recyclable remanufacturing system. The proposed model evaluates cost-effectiveness while integrating multiple products, multiple suppliers, multiple components and multiple machines for a remanufacturing system. Decision-makers can use the analytical results of this work to improve their understanding of the cost-effectiveness of recyclable remanufacturing planning. However, the remanufacturing production planning problems and related mathematical programming methods are unsuitable to yield an effective solution because of the conflicting nature of multiple objectives and related parameters. In this work, the fuzzy multi-objective linear programming mode with an interactive two-phase possibilistic linear programming approach is employed for solving the remanufacturing production system decision problems with multiple goals in a fuzzy environment. The analytical results presented in this work can help decision-makers to better understand the systematic analysis, potential for cost-effectiveness and the number of losses in a recoverable remanufacturing environment. Su, Tai-Sheng 蘇泰盛 2017 學位論文 ; thesis 69 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立屏東科技大學 === 工業管理系所 === 105 ===   In this work we consider the order delivery, new materials, recycling of recycled materials and a recyclable remanufacturing system. The proposed model evaluates cost-effectiveness while integrating multiple products, multiple suppliers, multiple components and multiple machines for a remanufacturing system. Decision-makers can use the analytical results of this work to improve their understanding of the cost-effectiveness of recyclable remanufacturing planning. However, the remanufacturing production planning problems and related mathematical programming methods are unsuitable to yield an effective solution because of the conflicting nature of multiple objectives and related parameters. In this work, the fuzzy multi-objective linear programming mode with an interactive two-phase possibilistic linear programming approach is employed for solving the remanufacturing production system decision problems with multiple goals in a fuzzy environment. The analytical results presented in this work can help decision-makers to better understand the systematic analysis, potential for cost-effectiveness and the number of losses in a recoverable remanufacturing environment.
author2 Su, Tai-Sheng
author_facet Su, Tai-Sheng
Cheng, Ya-Chi
鄭雅綺
author Cheng, Ya-Chi
鄭雅綺
spellingShingle Cheng, Ya-Chi
鄭雅綺
Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment
author_sort Cheng, Ya-Chi
title Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment
title_short Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment
title_full Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment
title_fullStr Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment
title_full_unstemmed Recoverable Remanufacturing Decisions of Multiple Products with Delivery Date and Fuzzy Environment
title_sort recoverable remanufacturing decisions of multiple products with delivery date and fuzzy environment
publishDate 2017
url http://ndltd.ncl.edu.tw/handle/6qaqbf
work_keys_str_mv AT chengyachi recoverableremanufacturingdecisionsofmultipleproductswithdeliverydateandfuzzyenvironment
AT zhèngyǎqǐ recoverableremanufacturingdecisionsofmultipleproductswithdeliverydateandfuzzyenvironment
AT chengyachi kǎoliàngjiāoqīyǔmóhúhuánjìngxiàzhīduōchǎnpǐnkěhuíshōuzàizhìzàojuécè
AT zhèngyǎqǐ kǎoliàngjiāoqīyǔmóhúhuánjìngxiàzhīduōchǎnpǐnkěhuíshōuzàizhìzàojuécè
_version_ 1719158280703442944