Manufacturing flow time estimation: case study of IC back-end assembly
碩士 === 國立高雄第一科技大學 === 運籌管理系碩士班 === 105 === The manufacturing processes become more and more complicated nowadays such as semiconductor manufacturing. The materials and components used in the processes also increase and they would be different according to which product types are used. There a...
Main Authors: | CHEN, YU-WEI, 陳昱惟 |
---|---|
Other Authors: | GUO, SHIN-MING |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/fq7f72 |
Similar Items
-
Simulation Optimization for Hybrid Flow Shop Scheduling Problem in Semiconductor Back-end Assembly
by: Chen, Chien Ming, et al.
Published: (2015) -
Applications of Systems Integration Engineering for Improving the Efficiency of Bumping Manufacture Flow in IC Assembly Houses
by: Jia-Fang Yu, et al.
Published: (2007) -
Applying lean production system to improve production cycle time on IC package Assembly & Testing manufacturing
by: Sheng wen Chen, et al.
Published: (2008) -
Analysis of Key Success Factors in Assembly Outsourcing Strategy– Using the IC Manufacturing Industry Company as An Example
by: Chen Shih Wei, et al.
Published: (2010) -
FMEA combined with the application of AHP– A Case Study of the IC Assemble Factory
by: Yuh-Ying Hu, et al.
Published: (2013)