Applying Genetic Algorithm to Schedule Brewery Production

碩士 === 國立中央大學 === 工業管理研究所 === 105 === Abstract Scheduling is one of the most important problems in any manufacturing industry. Therefore, the problem has been studied extendedly. Since, the scheduling problem is classified as NP-hard problem, which means the time required for finding the optimal sol...

Full description

Bibliographic Details
Main Authors: Bui Xuan Toan, 裴春全
Other Authors: Chi-Tai Wang
Format: Others
Language:en_US
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/p465f9

Similar Items