none

碩士 === 國立中央大學 === 土木工程學系 === 105 === The pipeline underground is the trend of underground engineering with the city development. To set up a new underground pipeline in the complex engineering environment will face more difficult challenges, and some special shield methods will be used more frequent...

Full description

Bibliographic Details
Main Authors: Yang-Pei Chun, 楊培君
Other Authors: Chang-Huei Wen
Format: Others
Language:zh-TW
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/24w39u
id ndltd-TW-105NCU05015099
record_format oai_dc
spelling ndltd-TW-105NCU050150992019-05-16T00:08:08Z http://ndltd.ncl.edu.tw/handle/24w39u none 砂土層中潛盾機地中接合漏水引致地層下陷之案例探討 Yang-Pei Chun 楊培君 碩士 國立中央大學 土木工程學系 105 The pipeline underground is the trend of underground engineering with the city development. To set up a new underground pipeline in the complex engineering environment will face more difficult challenges, and some special shield methods will be used more frequently. This research discussed the cause study of underground connection of shield tunnels performer by Taiwan Power Company. It is found that the main disaster was caused by the damage of sealing ring in the shield machine and this damage caused leakage and piping, and then caused the serious settlement of ground surface finally. Furthermore, the ground improvement was not implemented to protect the water pipe and sewage pipe above the tunnel. Therefore, the water pipe and sewage pipe were broken and caused the disaster more serious. To avoid the disaster expansion, the construction department took some urgent measures to control the disaster. In the future, it is suggested that the design of shield machine must consider the ground conditions, and the function of shield machine should be checked before construction. Furthermore, it is suggested to set up some common ducts in urban planning for protecting lifeline and preventing of repeated disasters. This experiment is valuable for giving us some suggestions to the future constructions to reduce the risk and cost. Chang-Huei Wen 張惠文 2017 學位論文 ; thesis 87 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 土木工程學系 === 105 === The pipeline underground is the trend of underground engineering with the city development. To set up a new underground pipeline in the complex engineering environment will face more difficult challenges, and some special shield methods will be used more frequently. This research discussed the cause study of underground connection of shield tunnels performer by Taiwan Power Company. It is found that the main disaster was caused by the damage of sealing ring in the shield machine and this damage caused leakage and piping, and then caused the serious settlement of ground surface finally. Furthermore, the ground improvement was not implemented to protect the water pipe and sewage pipe above the tunnel. Therefore, the water pipe and sewage pipe were broken and caused the disaster more serious. To avoid the disaster expansion, the construction department took some urgent measures to control the disaster. In the future, it is suggested that the design of shield machine must consider the ground conditions, and the function of shield machine should be checked before construction. Furthermore, it is suggested to set up some common ducts in urban planning for protecting lifeline and preventing of repeated disasters. This experiment is valuable for giving us some suggestions to the future constructions to reduce the risk and cost.
author2 Chang-Huei Wen
author_facet Chang-Huei Wen
Yang-Pei Chun
楊培君
author Yang-Pei Chun
楊培君
spellingShingle Yang-Pei Chun
楊培君
none
author_sort Yang-Pei Chun
title none
title_short none
title_full none
title_fullStr none
title_full_unstemmed none
title_sort none
publishDate 2017
url http://ndltd.ncl.edu.tw/handle/24w39u
work_keys_str_mv AT yangpeichun none
AT yángpéijūn none
AT yangpeichun shātǔcéngzhōngqiándùnjīdezhōngjiēhélòushuǐyǐnzhìdecéngxiàxiànzhīànlìtàntǎo
AT yángpéijūn shātǔcéngzhōngqiándùnjīdezhōngjiēhélòushuǐyǐnzhìdecéngxiàxiànzhīànlìtàntǎo
_version_ 1719159869352706048