Applying Bootstrap Method to Construct Individual-moving Range Control Chart for Start-up process
碩士 === 國立交通大學 === 工業工程與管理系所 === 105 === The most commonly used control chart in industry is Shewhart control chart, which requires at least 100 sample data to accurately estimate the parameters of process and then construct the Shewhart’s control chart. There are more and more start-up process now....
Main Authors: | Chen, Lin-Ze, 陳林澤 |
---|---|
Other Authors: | Tong, Lee-Ing |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/k7dad7 |
Similar Items
-
Applying Nonparametric Bootstrap Method to Construct Q Control Chart for Start-up process
by: Liu, Yu-Cheng, et al.
Published: (2017) -
Applying BLIEs Method to Construct a Bootstrap Control Chart for the Percentile of Start-Up Weibull Processes
by: Weng, Erh-Cheng, et al.
Published: (2019) -
Applying MLE Method to Estimate the Low Percentile and Construct a Bootstrap Control Chart for the Low Percentile of a Start-up Weibull Process
by: Yu, Ya-Ting, et al.
Published: (2018) -
Constructing the Tukey Control Chart for the Weibull Percentile of a Weibull Start-Up Process using Maximum Likelihood Estimation and Bootstrap Methods
by: Lin, Ching-Hung, et al.
Published: (2019) -
Applying Non-parametric Bootstrap Method to Construct x-bar Control Chart for Burr Distribution process
by: Chang, Ya-Ting, et al.
Published: (2016)