Optimal multi-type arc restoration scheduling considering blocked traffic for pipeline networks in post-disaster management
碩士 === 國立成功大學 === 資訊管理研究所 === 105
Main Authors: | Xiao-YunHong, 洪筱昀 |
---|---|
Other Authors: | I-Lin Wang |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/33utbp |
Similar Items
-
An arc restoration scheduling problem for pipeline networks in post-disaster management
by: Ping-ChengLin, et al.
Published: (2016) -
Optimal Arc Restoration Scheduling for Rooted Trees
by: Meng-HsiuWu, et al.
Published: (2018) -
Resource-driven Scheduling Model for Post-disaster Road Recovery Considering Rescheduling Mechanisms
by: Fang-Chieh Chung, et al.
Published: (2011) -
Electric Power Grid Restoration Considering Disaster Economics
by: Ali Arab, et al.
Published: (2016-01-01) -
Ranking Approach to Scheduling Repairs of a Water Distribution System for the Post-Disaster Response and Restoration Service
by: Alicja Bałut, et al.
Published: (2019-07-01)