The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company

碩士 === 朝陽科技大學 === 工業工程與管理系 === 105 === In this research, using F Value to measure and improve the turn-over rate of work-in-process (WIP) is studied by a case of the of the bicycle handlebar manufacturing of J Company. First, the quantity of each WIP station is investigated by a sampling method. The...

Full description

Bibliographic Details
Main Authors: Hsu, Ho-Wie, 許宏偉
Other Authors: Cheng, Chun-Yuan
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/u8u48c
id ndltd-TW-105CYUT0031006
record_format oai_dc
spelling ndltd-TW-105CYUT00310062019-05-15T23:09:30Z http://ndltd.ncl.edu.tw/handle/u8u48c The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company 生產系統物流F值分析與WIP點改善-以J公司車把手製造為例 Hsu, Ho-Wie 許宏偉 碩士 朝陽科技大學 工業工程與管理系 105 In this research, using F Value to measure and improve the turn-over rate of work-in-process (WIP) is studied by a case of the of the bicycle handlebar manufacturing of J Company. First, the quantity of each WIP station is investigated by a sampling method. Then, the F value is calculated for each work station. Finally, for the work stations with worse F values are improved by using the skills of ECRS (elimination, combination, rearrangement, simplification). Moreover, using the results of this case study, a continuous improvement mechanism is established for increasing the turn-over rate of the WIP. From the results of this case study, it is shown that the F value can reflect the work station with severe WIP turn-over rate problem and line balancing problem. The established continuous improvement mechanism can be applied to similar industry to improve the WIP turn-over rate. Cheng, Chun-Yuan 鄭純媛 2016 學位論文 ; thesis 46 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 朝陽科技大學 === 工業工程與管理系 === 105 === In this research, using F Value to measure and improve the turn-over rate of work-in-process (WIP) is studied by a case of the of the bicycle handlebar manufacturing of J Company. First, the quantity of each WIP station is investigated by a sampling method. Then, the F value is calculated for each work station. Finally, for the work stations with worse F values are improved by using the skills of ECRS (elimination, combination, rearrangement, simplification). Moreover, using the results of this case study, a continuous improvement mechanism is established for increasing the turn-over rate of the WIP. From the results of this case study, it is shown that the F value can reflect the work station with severe WIP turn-over rate problem and line balancing problem. The established continuous improvement mechanism can be applied to similar industry to improve the WIP turn-over rate.
author2 Cheng, Chun-Yuan
author_facet Cheng, Chun-Yuan
Hsu, Ho-Wie
許宏偉
author Hsu, Ho-Wie
許宏偉
spellingShingle Hsu, Ho-Wie
許宏偉
The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company
author_sort Hsu, Ho-Wie
title The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company
title_short The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company
title_full The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company
title_fullStr The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company
title_full_unstemmed The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company
title_sort turn-over rate improvement of work-in-process with the measurement of f value –a case study of the bicycle handlebar manufacturing of j company
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/u8u48c
work_keys_str_mv AT hsuhowie theturnoverrateimprovementofworkinprocesswiththemeasurementoffvalueacasestudyofthebicyclehandlebarmanufacturingofjcompany
AT xǔhóngwěi theturnoverrateimprovementofworkinprocesswiththemeasurementoffvalueacasestudyofthebicyclehandlebarmanufacturingofjcompany
AT hsuhowie shēngchǎnxìtǒngwùliúfzhífēnxīyǔwipdiǎngǎishànyǐjgōngsīchēbǎshǒuzhìzàowèilì
AT xǔhóngwěi shēngchǎnxìtǒngwùliúfzhífēnxīyǔwipdiǎngǎishànyǐjgōngsīchēbǎshǒuzhìzàowèilì
AT hsuhowie turnoverrateimprovementofworkinprocesswiththemeasurementoffvalueacasestudyofthebicyclehandlebarmanufacturingofjcompany
AT xǔhóngwěi turnoverrateimprovementofworkinprocesswiththemeasurementoffvalueacasestudyofthebicyclehandlebarmanufacturingofjcompany
_version_ 1719142415868100608