The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company
碩士 === 朝陽科技大學 === 工業工程與管理系 === 105 === In this research, using F Value to measure and improve the turn-over rate of work-in-process (WIP) is studied by a case of the of the bicycle handlebar manufacturing of J Company. First, the quantity of each WIP station is investigated by a sampling method. The...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/u8u48c |
id |
ndltd-TW-105CYUT0031006 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-105CYUT00310062019-05-15T23:09:30Z http://ndltd.ncl.edu.tw/handle/u8u48c The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company 生產系統物流F值分析與WIP點改善-以J公司車把手製造為例 Hsu, Ho-Wie 許宏偉 碩士 朝陽科技大學 工業工程與管理系 105 In this research, using F Value to measure and improve the turn-over rate of work-in-process (WIP) is studied by a case of the of the bicycle handlebar manufacturing of J Company. First, the quantity of each WIP station is investigated by a sampling method. Then, the F value is calculated for each work station. Finally, for the work stations with worse F values are improved by using the skills of ECRS (elimination, combination, rearrangement, simplification). Moreover, using the results of this case study, a continuous improvement mechanism is established for increasing the turn-over rate of the WIP. From the results of this case study, it is shown that the F value can reflect the work station with severe WIP turn-over rate problem and line balancing problem. The established continuous improvement mechanism can be applied to similar industry to improve the WIP turn-over rate. Cheng, Chun-Yuan 鄭純媛 2016 學位論文 ; thesis 46 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 朝陽科技大學 === 工業工程與管理系 === 105 === In this research, using F Value to measure and improve the turn-over rate of work-in-process (WIP) is studied by a case of the of the bicycle handlebar manufacturing of J Company. First, the quantity of each WIP station is investigated by a sampling method. Then, the F value is calculated for each work station. Finally, for the work stations with worse F values are improved by using the skills of ECRS (elimination, combination, rearrangement, simplification). Moreover, using the results of this case study, a continuous improvement mechanism is established for increasing the turn-over rate of the WIP.
From the results of this case study, it is shown that the F value can reflect the work station with severe WIP turn-over rate problem and line balancing problem. The established continuous improvement mechanism can be applied to similar industry to improve the WIP turn-over rate.
|
author2 |
Cheng, Chun-Yuan |
author_facet |
Cheng, Chun-Yuan Hsu, Ho-Wie 許宏偉 |
author |
Hsu, Ho-Wie 許宏偉 |
spellingShingle |
Hsu, Ho-Wie 許宏偉 The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company |
author_sort |
Hsu, Ho-Wie |
title |
The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company |
title_short |
The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company |
title_full |
The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company |
title_fullStr |
The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company |
title_full_unstemmed |
The Turn-over Rate Improvement of Work-in-process with the Measurement of F Value –A Case Study of the Bicycle Handlebar Manufacturing of J Company |
title_sort |
turn-over rate improvement of work-in-process with the measurement of f value –a case study of the bicycle handlebar manufacturing of j company |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/u8u48c |
work_keys_str_mv |
AT hsuhowie theturnoverrateimprovementofworkinprocesswiththemeasurementoffvalueacasestudyofthebicyclehandlebarmanufacturingofjcompany AT xǔhóngwěi theturnoverrateimprovementofworkinprocesswiththemeasurementoffvalueacasestudyofthebicyclehandlebarmanufacturingofjcompany AT hsuhowie shēngchǎnxìtǒngwùliúfzhífēnxīyǔwipdiǎngǎishànyǐjgōngsīchēbǎshǒuzhìzàowèilì AT xǔhóngwěi shēngchǎnxìtǒngwùliúfzhífēnxīyǔwipdiǎngǎishànyǐjgōngsīchēbǎshǒuzhìzàowèilì AT hsuhowie turnoverrateimprovementofworkinprocesswiththemeasurementoffvalueacasestudyofthebicyclehandlebarmanufacturingofjcompany AT xǔhóngwěi turnoverrateimprovementofworkinprocesswiththemeasurementoffvalueacasestudyofthebicyclehandlebarmanufacturingofjcompany |
_version_ |
1719142415868100608 |