Test Setup for Design Approval of PC sleeper in Taichung MRT System
碩士 === 國立雲林科技大學 === 營建工程系 === 104 === The ongoing Taichung MRT green line project use a lot of prestressed concrete sleepers. Before mass production of PC sleepers, an design approval test is required to verify the performance of the sleeper. The sleeper design of Taichung MRT system is quite simila...
Main Authors: | Bang-Zhi Wang, 王邦志 |
---|---|
Other Authors: | Hung-Jen Lee |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/97495240096503417146 |
Similar Items
-
Design Approval Tests and Evaluation of PC Sleepers for TPE Airport MRT System
by: Adrian S. Leslie, et al.
Published: (2009) -
MRT System Service Index - A Case Study of Taichung MRT System
by: LIN,YEN-BO, et al.
Published: (2018) -
Test methods and requirements for fastening systems for concrete sleepers
by: Vilotijević Milica, et al.
Published: (2017-01-01) -
Optical Pump - THz Probe System Setup and Application
by: Bang-Yu Hsu, et al.
Published: (2003) -
The Effects of Taichung MRT Green Line on Housing Prices
by: Su-hsiangHuang, et al.
Published: (2014)