Summary: | 碩士 === 大同大學 === 工程管理碩士在職專班 === 104 === The logic specification through the knowledge management system, manage the breakdown among contractors in the implementation process, to ensure construction quality and in line with the expected cost.
To avoid job because of regulatory barriers caused by differences in knowledge, result product defects, further affect the value of goods, particularly among different industry construction interface integration process. The common reason is to failed to "conformance standard city hills project, the project would be delayed or even an accident indirectly led to the increase in operating costs.
This study based on participant observation, cited "city hills and knowledge transfer" and “transaction cost theory “ with literature review of knowledge interface integration processes obstacles analysis and on line interview each other to confirm, integrate knowledge city hills analysis in terms of important factors influencing interface integration process in order to enhance the efficiency of integration interfaces.
|