Optimal Grounding Planning for the Underground Cable Transmission System Considering the Protections of CCS and CCPU Arresters.

碩士 === 國立臺北科技大學 === 電機工程研究所 === 104 === When the transmission system comprising overhead lines and underground cables, cable connections stations (CCS) and cable joints is where the highest failure rate, the main ground potential rise of ground fault is transferred to the CCS and cable cover protect...

Full description

Bibliographic Details
Main Authors: Gin-An Lin, 林晉安
Other Authors: 周至如
Format: Others
Language:zh-TW
Online Access:http://ndltd.ncl.edu.tw/handle/m5u2wu