Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management

碩士 === 國立臺北科技大學 === 工業工程與管理系碩士班 === 104 === Project management (PM) issues have long attracted interest from both practitioners and academics. In realistic decision problems, related parameters and environmental coefficients are usually imprecise, and decision maker (DM) must simultaneously regulate...

Full description

Bibliographic Details
Main Authors: Chia-hsiu Liang, 梁嘉修
Other Authors: 林志平
Format: Others
Online Access:http://ndltd.ncl.edu.tw/handle/332qtc
id ndltd-TW-104TIT05031057
record_format oai_dc
spelling ndltd-TW-104TIT050310572019-05-15T22:54:23Z http://ndltd.ncl.edu.tw/handle/332qtc Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management 用模糊層級分析法與互動式二階法於模糊多目標專案管理 Chia-hsiu Liang 梁嘉修 碩士 國立臺北科技大學 工業工程與管理系碩士班 104 Project management (PM) issues have long attracted interest from both practitioners and academics. In realistic decision problems, related parameters and environmental coefficients are usually imprecise, and decision maker (DM) must simultaneously regulate conflicting goals with the usage of all related resources. This work aims to utilize FAHP and two-phase methodology to solve PM decision problems and to find the fuzzy optimal solution of problems occurring in the real world situations. Using two-phase methodology to endure disadvantage that the optimal solution obtained by minimum operator in phase I maybe not efficient. Then Utilizes FAHP method to make priority of objective which can satisfy some particular demands of DM in phase II. 林志平 學位論文 ; thesis 0
collection NDLTD
format Others
sources NDLTD
description 碩士 === 國立臺北科技大學 === 工業工程與管理系碩士班 === 104 === Project management (PM) issues have long attracted interest from both practitioners and academics. In realistic decision problems, related parameters and environmental coefficients are usually imprecise, and decision maker (DM) must simultaneously regulate conflicting goals with the usage of all related resources. This work aims to utilize FAHP and two-phase methodology to solve PM decision problems and to find the fuzzy optimal solution of problems occurring in the real world situations. Using two-phase methodology to endure disadvantage that the optimal solution obtained by minimum operator in phase I maybe not efficient. Then Utilizes FAHP method to make priority of objective which can satisfy some particular demands of DM in phase II.
author2 林志平
author_facet 林志平
Chia-hsiu Liang
梁嘉修
author Chia-hsiu Liang
梁嘉修
spellingShingle Chia-hsiu Liang
梁嘉修
Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management
author_sort Chia-hsiu Liang
title Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management
title_short Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management
title_full Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management
title_fullStr Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management
title_full_unstemmed Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management
title_sort applying fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management
url http://ndltd.ncl.edu.tw/handle/332qtc
work_keys_str_mv AT chiahsiuliang applyingfuzzyanalytichierarchyprocessandinteractivetwophasemethodtomultiobjectiveprojectmanagement
AT liángjiāxiū applyingfuzzyanalytichierarchyprocessandinteractivetwophasemethodtomultiobjectiveprojectmanagement
AT chiahsiuliang yòngmóhúcéngjífēnxīfǎyǔhùdòngshìèrjiēfǎyúmóhúduōmùbiāozhuānànguǎnlǐ
AT liángjiāxiū yòngmóhúcéngjífēnxīfǎyǔhùdòngshìèrjiēfǎyúmóhúduōmùbiāozhuānànguǎnlǐ
_version_ 1719137628059598848