Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management
碩士 === 國立臺北科技大學 === 工業工程與管理系碩士班 === 104 === Project management (PM) issues have long attracted interest from both practitioners and academics. In realistic decision problems, related parameters and environmental coefficients are usually imprecise, and decision maker (DM) must simultaneously regulate...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Online Access: | http://ndltd.ncl.edu.tw/handle/332qtc |
id |
ndltd-TW-104TIT05031057 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-104TIT050310572019-05-15T22:54:23Z http://ndltd.ncl.edu.tw/handle/332qtc Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management 用模糊層級分析法與互動式二階法於模糊多目標專案管理 Chia-hsiu Liang 梁嘉修 碩士 國立臺北科技大學 工業工程與管理系碩士班 104 Project management (PM) issues have long attracted interest from both practitioners and academics. In realistic decision problems, related parameters and environmental coefficients are usually imprecise, and decision maker (DM) must simultaneously regulate conflicting goals with the usage of all related resources. This work aims to utilize FAHP and two-phase methodology to solve PM decision problems and to find the fuzzy optimal solution of problems occurring in the real world situations. Using two-phase methodology to endure disadvantage that the optimal solution obtained by minimum operator in phase I maybe not efficient. Then Utilizes FAHP method to make priority of objective which can satisfy some particular demands of DM in phase II. 林志平 學位論文 ; thesis 0 |
collection |
NDLTD |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺北科技大學 === 工業工程與管理系碩士班 === 104 === Project management (PM) issues have long attracted interest from both practitioners and academics. In realistic decision problems, related parameters and environmental coefficients are usually imprecise, and decision maker (DM) must simultaneously regulate conflicting goals with the usage of all related resources. This work aims to utilize FAHP and two-phase methodology to solve PM decision problems and to find the fuzzy optimal solution of problems occurring in the real world situations. Using two-phase methodology to endure disadvantage that the optimal solution obtained by minimum operator in phase I maybe not efficient. Then Utilizes FAHP method to make priority of objective which can satisfy some particular demands of DM in phase II.
|
author2 |
林志平 |
author_facet |
林志平 Chia-hsiu Liang 梁嘉修 |
author |
Chia-hsiu Liang 梁嘉修 |
spellingShingle |
Chia-hsiu Liang 梁嘉修 Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management |
author_sort |
Chia-hsiu Liang |
title |
Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management |
title_short |
Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management |
title_full |
Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management |
title_fullStr |
Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management |
title_full_unstemmed |
Applying Fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management |
title_sort |
applying fuzzy analytic hierarchy process and interactive two phase method to multi-objective project management |
url |
http://ndltd.ncl.edu.tw/handle/332qtc |
work_keys_str_mv |
AT chiahsiuliang applyingfuzzyanalytichierarchyprocessandinteractivetwophasemethodtomultiobjectiveprojectmanagement AT liángjiāxiū applyingfuzzyanalytichierarchyprocessandinteractivetwophasemethodtomultiobjectiveprojectmanagement AT chiahsiuliang yòngmóhúcéngjífēnxīfǎyǔhùdòngshìèrjiēfǎyúmóhúduōmùbiāozhuānànguǎnlǐ AT liángjiāxiū yòngmóhúcéngjífēnxīfǎyǔhùdòngshìèrjiēfǎyúmóhúduōmùbiāozhuānànguǎnlǐ |
_version_ |
1719137628059598848 |