碩士 === 國立臺灣科技大學 === 建築系 === 104 === Abstract : The most of contract mode in Taiwan are Design-Bid-Build (DBB).The architecture or engineering firms commissioned by owner will develop feasibility study, basic design and detail design, at the same time, the contractor will not be decided before biddin...

Full description

Bibliographic Details
Main Authors: Chao Chun Kung, 龔昭君
Other Authors: Shen Ghen Shin
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/28213592404547809932
id ndltd-TW-104NTUS5222053
record_format oai_dc
spelling ndltd-TW-104NTUS52220532017-09-10T04:30:09Z http://ndltd.ncl.edu.tw/handle/28213592404547809932 Department of Architecture National Taiwan Universityof Science and Technology 機電系統導入BIM於設計流程之問題檢討 Chao Chun Kung 龔昭君 碩士 國立臺灣科技大學 建築系 104 Abstract : The most of contract mode in Taiwan are Design-Bid-Build (DBB).The architecture or engineering firms commissioned by owner will develop feasibility study, basic design and detail design, at the same time, the contractor will not be decided before bidding procedure. All the equipment and material will not be approved by owner, those equipment size and interface location is not confirmed neither. Hence, all the equipment size are designed size in design phase, and not for real size in construction phase. You have to do again CSD/SEM (Combined Service Drawing / Structure, Electrical and,Mechanical)in construction phase, even though you have done in design phase. The reason is all the equipment size and interface location are different for both phases. All the piping routine and direction will be revised again according to approved equipment that provides real size and interface location, and it will be resulted in CSD/SEM again for those revised piping. In view of this, the BIM in design phase will be built for trunk piping and bigger equipment in order to review space location and line planning reasonability. This phase is not for planning branch piping location, because the thing changed is often happened during construction phase. Actually, the most of piping layout in design phase are not sure for during construction phase. We will discuss which level of development of BIM in design phase that can be extended to the construction phase for continuous utilization to avoid doing redundant effort without getting any benefits from BIM. Shen Ghen Shin 施宣光 2016 學位論文 ; thesis 45 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 建築系 === 104 === Abstract : The most of contract mode in Taiwan are Design-Bid-Build (DBB).The architecture or engineering firms commissioned by owner will develop feasibility study, basic design and detail design, at the same time, the contractor will not be decided before bidding procedure. All the equipment and material will not be approved by owner, those equipment size and interface location is not confirmed neither. Hence, all the equipment size are designed size in design phase, and not for real size in construction phase. You have to do again CSD/SEM (Combined Service Drawing / Structure, Electrical and,Mechanical)in construction phase, even though you have done in design phase. The reason is all the equipment size and interface location are different for both phases. All the piping routine and direction will be revised again according to approved equipment that provides real size and interface location, and it will be resulted in CSD/SEM again for those revised piping. In view of this, the BIM in design phase will be built for trunk piping and bigger equipment in order to review space location and line planning reasonability. This phase is not for planning branch piping location, because the thing changed is often happened during construction phase. Actually, the most of piping layout in design phase are not sure for during construction phase. We will discuss which level of development of BIM in design phase that can be extended to the construction phase for continuous utilization to avoid doing redundant effort without getting any benefits from BIM.
author2 Shen Ghen Shin
author_facet Shen Ghen Shin
Chao Chun Kung
龔昭君
author Chao Chun Kung
龔昭君
spellingShingle Chao Chun Kung
龔昭君
Department of Architecture National Taiwan Universityof Science and Technology
author_sort Chao Chun Kung
title Department of Architecture National Taiwan Universityof Science and Technology
title_short Department of Architecture National Taiwan Universityof Science and Technology
title_full Department of Architecture National Taiwan Universityof Science and Technology
title_fullStr Department of Architecture National Taiwan Universityof Science and Technology
title_full_unstemmed Department of Architecture National Taiwan Universityof Science and Technology
title_sort department of architecture national taiwan universityof science and technology
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/28213592404547809932
work_keys_str_mv AT chaochunkung departmentofarchitecturenationaltaiwanuniversityofscienceandtechnology
AT gōngzhāojūn departmentofarchitecturenationaltaiwanuniversityofscienceandtechnology
AT chaochunkung jīdiànxìtǒngdǎorùbimyúshèjìliúchéngzhīwèntíjiǎntǎo
AT gōngzhāojūn jīdiànxìtǒngdǎorùbimyúshèjìliúchéngzhīwèntíjiǎntǎo
_version_ 1718531818910646272