The Feasibility Analysis of Advanced Planning and Scheduling System –A Case Study of Rizhao Steel Corporation
碩士 === 國立中山大學 === 資訊管理學系研究所 === 104 === Working on a current manufacturing system, a business has to achieve effective control of raw materials, coordination and capacity in order to immediately and accurately respond to customers’ requirements while facing changeable markets and production sites. A...
Main Authors: | Tzu-tuo Yang, 楊子拓 |
---|---|
Other Authors: | Hsin-Hui Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/4n47ny |
Similar Items
-
Marine debris surveys on four beaches in Rizhao City of China
by: C. Zhou, et al.
Published: (2015-09-01) -
Assessments of land subsidence along the Rizhao–Lankao high-speed railway at Heze, China, between 2015 and 2019 with Sentinel-1 data
by: C. Zhu, et al.
Published: (2020-12-01) -
Advanced Planning and Scheduling Systems
by: Ya-Yuan Teng, et al.
Published: (2000) -
The Impact of the Advanced Planning and Scheduling on the Supply Chain of Stainless Steel Industry
by: Chong-Cheng Huang, et al.
Published: (2003) -
An Algorithm for Advanced Planning and Scheduling System
by: Chung-Hao Min, et al.
Published: (2001)