An Optimal Composite Inspection Plan under Stochastic Process Theorem

碩士 === 國立屏東科技大學 === 工業管理系所 === 104 === To improve the quality of product, traditional inspection method is 100% inspection or sampling inspection. But the process of inspection has to consider the cost and elastic. This study used stochastic processes theory as a base to propose a new sampling sche...

Full description

Bibliographic Details
Main Authors: Hsieh, Ya-Hui, 謝雅惠
Other Authors: Huang, Yun-Cheng
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/61714805149769299934
id ndltd-TW-104NPUS5041020
record_format oai_dc
spelling ndltd-TW-104NPUS50410202017-09-03T04:26:00Z http://ndltd.ncl.edu.tw/handle/61714805149769299934 An Optimal Composite Inspection Plan under Stochastic Process Theorem 根據隨機過程理論建構複合式最適檢驗計畫之研究 Hsieh, Ya-Hui 謝雅惠 碩士 國立屏東科技大學 工業管理系所 104 To improve the quality of product, traditional inspection method is 100% inspection or sampling inspection. But the process of inspection has to consider the cost and elastic. This study used stochastic processes theory as a base to propose a new sampling scheme model. The first stage of the inspection scheme is 100% inspection and the second stage is sampling inspection. This new composite inspection method can combine the advantage of 100% inspection and sampling inspection. Experimental result showed that this sampling scheme model can propose an optimal sampling scheme and maximization the total profit. Huang, Yun-Cheng 黃允成 2016 學位論文 ; thesis 70 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立屏東科技大學 === 工業管理系所 === 104 === To improve the quality of product, traditional inspection method is 100% inspection or sampling inspection. But the process of inspection has to consider the cost and elastic. This study used stochastic processes theory as a base to propose a new sampling scheme model. The first stage of the inspection scheme is 100% inspection and the second stage is sampling inspection. This new composite inspection method can combine the advantage of 100% inspection and sampling inspection. Experimental result showed that this sampling scheme model can propose an optimal sampling scheme and maximization the total profit.
author2 Huang, Yun-Cheng
author_facet Huang, Yun-Cheng
Hsieh, Ya-Hui
謝雅惠
author Hsieh, Ya-Hui
謝雅惠
spellingShingle Hsieh, Ya-Hui
謝雅惠
An Optimal Composite Inspection Plan under Stochastic Process Theorem
author_sort Hsieh, Ya-Hui
title An Optimal Composite Inspection Plan under Stochastic Process Theorem
title_short An Optimal Composite Inspection Plan under Stochastic Process Theorem
title_full An Optimal Composite Inspection Plan under Stochastic Process Theorem
title_fullStr An Optimal Composite Inspection Plan under Stochastic Process Theorem
title_full_unstemmed An Optimal Composite Inspection Plan under Stochastic Process Theorem
title_sort optimal composite inspection plan under stochastic process theorem
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/61714805149769299934
work_keys_str_mv AT hsiehyahui anoptimalcompositeinspectionplanunderstochasticprocesstheorem
AT xièyǎhuì anoptimalcompositeinspectionplanunderstochasticprocesstheorem
AT hsiehyahui gēnjùsuíjīguòchénglǐlùnjiàngòufùhéshìzuìshìjiǎnyànjìhuàzhīyánjiū
AT xièyǎhuì gēnjùsuíjīguòchénglǐlùnjiàngòufùhéshìzuìshìjiǎnyànjìhuàzhīyánjiū
AT hsiehyahui optimalcompositeinspectionplanunderstochasticprocesstheorem
AT xièyǎhuì optimalcompositeinspectionplanunderstochasticprocesstheorem
_version_ 1718526367227707392