Establishment of Schedule Review Process and Criteria for Construction Projects

碩士 === 國立中央大學 === 營建管理研究所 === 104 === Schedule delays in Taiwan’s public construction project are normally happened. If we do not indeed make the progress under well-controlled, a schedule delay would be expectable. It usually causes a dispute between contract parties. A good schedule is one of pow...

Full description

Bibliographic Details
Main Authors: Yung- Chieh Chou, 周詠傑
Other Authors: Jyh-Bin Yang
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/09856876915641169839
id ndltd-TW-104NCU05718018
record_format oai_dc
spelling ndltd-TW-104NCU057180182017-05-20T04:30:16Z http://ndltd.ncl.edu.tw/handle/09856876915641169839 Establishment of Schedule Review Process and Criteria for Construction Projects 營建工程時程網圖審查作業流程與準則建立之研究 Yung- Chieh Chou 周詠傑 碩士 國立中央大學 營建管理研究所 104 Schedule delays in Taiwan’s public construction project are normally happened. If we do not indeed make the progress under well-controlled, a schedule delay would be expectable. It usually causes a dispute between contract parties. A good schedule is one of powerful tools to manage the progress of a project. And it is also an important evidence when construction disputes occur. Therefore, it is necessary to make sure and review its correctness and rationality. In fact, the schedule reviewers in Taiwan are not capable enough in average. Besides the government agencies have not established standard operating procedures for reviewing schedule. They do not provide workable review criteria for the reviewer as well. Thus schedule review become nothing more than a slogan. Compared to the workable regulations and criteria in other countries, to develop useful schedule review process and criteria in Taiwan is necessary. Based on available practical schedule review process and criteria, this study developed schedule review processes, review items and review criteria, and then examined them by three real cases. The outcomes of this study can be used to assist schedule reviewers to perform necessary review works. Hopefully, the study results can improve the quality of schedule development and review, and increase the performance of schedule management in the future. Jyh-Bin Yang 楊智斌 2016 學位論文 ; thesis 121 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 營建管理研究所 === 104 === Schedule delays in Taiwan’s public construction project are normally happened. If we do not indeed make the progress under well-controlled, a schedule delay would be expectable. It usually causes a dispute between contract parties. A good schedule is one of powerful tools to manage the progress of a project. And it is also an important evidence when construction disputes occur. Therefore, it is necessary to make sure and review its correctness and rationality. In fact, the schedule reviewers in Taiwan are not capable enough in average. Besides the government agencies have not established standard operating procedures for reviewing schedule. They do not provide workable review criteria for the reviewer as well. Thus schedule review become nothing more than a slogan. Compared to the workable regulations and criteria in other countries, to develop useful schedule review process and criteria in Taiwan is necessary. Based on available practical schedule review process and criteria, this study developed schedule review processes, review items and review criteria, and then examined them by three real cases. The outcomes of this study can be used to assist schedule reviewers to perform necessary review works. Hopefully, the study results can improve the quality of schedule development and review, and increase the performance of schedule management in the future.
author2 Jyh-Bin Yang
author_facet Jyh-Bin Yang
Yung- Chieh Chou
周詠傑
author Yung- Chieh Chou
周詠傑
spellingShingle Yung- Chieh Chou
周詠傑
Establishment of Schedule Review Process and Criteria for Construction Projects
author_sort Yung- Chieh Chou
title Establishment of Schedule Review Process and Criteria for Construction Projects
title_short Establishment of Schedule Review Process and Criteria for Construction Projects
title_full Establishment of Schedule Review Process and Criteria for Construction Projects
title_fullStr Establishment of Schedule Review Process and Criteria for Construction Projects
title_full_unstemmed Establishment of Schedule Review Process and Criteria for Construction Projects
title_sort establishment of schedule review process and criteria for construction projects
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/09856876915641169839
work_keys_str_mv AT yungchiehchou establishmentofschedulereviewprocessandcriteriaforconstructionprojects
AT zhōuyǒngjié establishmentofschedulereviewprocessandcriteriaforconstructionprojects
AT yungchiehchou yíngjiàngōngchéngshíchéngwǎngtúshěncházuòyèliúchéngyǔzhǔnzéjiànlìzhīyánjiū
AT zhōuyǒngjié yíngjiàngōngchéngshíchéngwǎngtúshěncházuòyèliúchéngyǔzhǔnzéjiànlìzhīyánjiū
_version_ 1718449787496300544