Developing Construction Oriented Change Management System
博士 === 國立交通大學 === 土木工程系所 === 104 === Change management (CM) has become the most important project management strategy in construction management. Construction CM is the systematic control approach of all communications that support a project-based change-related process effectively. Change issues sh...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/86603747560905825067 |
id |
ndltd-TW-104NCTU5015063 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-104NCTU50150632017-09-06T04:22:13Z http://ndltd.ncl.edu.tw/handle/86603747560905825067 Developing Construction Oriented Change Management System 施工變更管理系統建構之研究 Tsui,Yu-Kun 崔玉坤 博士 國立交通大學 土木工程系所 104 Change management (CM) has become the most important project management strategy in construction management. Construction CM is the systematic control approach of all communications that support a project-based change-related process effectively. Change issues should be identified and traced effectively to improve construction management performance. Despite many academic studies and discussions regarding CM, suitable and systematic approaches for managing changes integrated with construction projects are still lacking. This study develops project oriented change management approach and system for construction projects to enhance CM effectively in the construction phase of a project. The proposed CM approach includes the development of change information sheet, change record sheet, change control document, change breakdown structure, change matrix. The proposed CM approach and system has been applied in a case study of a selected construction project in Taiwan for verification purposes and to demonstrate the effectiveness of CM in the construction phase. Based on this case study, the results indicate that construction CM can be improved effectively using the proposed approaches. This study also discusses the benefits and limitation of practical implementation of proposed CM approach and system. Dzeng, Ren-Jye Chen, Chun-Sung 曾仁杰 陳春盛 2016 學位論文 ; thesis 124 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
博士 === 國立交通大學 === 土木工程系所 === 104 === Change management (CM) has become the most important project management strategy in construction management. Construction CM is the systematic control approach of all communications that support a project-based change-related process effectively. Change issues should be identified and traced effectively to improve construction management performance. Despite many academic studies and discussions regarding CM, suitable and systematic approaches for managing changes integrated with construction projects are still lacking. This study develops project oriented change management approach and system for construction projects to enhance CM effectively in the construction phase of a project. The proposed CM approach includes the development of change information sheet, change record sheet, change control document, change breakdown structure, change matrix. The proposed CM approach and system has been applied in a case study of a selected construction project in Taiwan for verification purposes and to demonstrate the effectiveness of CM in the construction phase. Based on this case study, the results indicate that construction CM can be improved effectively using the proposed approaches. This study also discusses the benefits and limitation of practical implementation of proposed CM approach and system.
|
author2 |
Dzeng, Ren-Jye |
author_facet |
Dzeng, Ren-Jye Tsui,Yu-Kun 崔玉坤 |
author |
Tsui,Yu-Kun 崔玉坤 |
spellingShingle |
Tsui,Yu-Kun 崔玉坤 Developing Construction Oriented Change Management System |
author_sort |
Tsui,Yu-Kun |
title |
Developing Construction Oriented Change Management System |
title_short |
Developing Construction Oriented Change Management System |
title_full |
Developing Construction Oriented Change Management System |
title_fullStr |
Developing Construction Oriented Change Management System |
title_full_unstemmed |
Developing Construction Oriented Change Management System |
title_sort |
developing construction oriented change management system |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/86603747560905825067 |
work_keys_str_mv |
AT tsuiyukun developingconstructionorientedchangemanagementsystem AT cuīyùkūn developingconstructionorientedchangemanagementsystem AT tsuiyukun shīgōngbiàngèngguǎnlǐxìtǒngjiàngòuzhīyánjiū AT cuīyùkūn shīgōngbiàngèngguǎnlǐxìtǒngjiàngòuzhīyánjiū |
_version_ |
1718527031723950080 |