BIM Elemental Cost Estimation Method in Early Project Stage
碩士 === 國立交通大學 === 土木工程系所 === 104
Main Authors: | Fang, Le-Hang, 方樂航 |
---|---|
Other Authors: | Wang, Wei-Chih |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/62321356159401934370 |
Similar Items
-
Applying BIM to Estimate Construction Costs in Project Early Stages
by: Ho, Meng-Cheng, et al.
Published: (2015) -
Application of BIM in early stage design cost estimation
by: Maskuriy, Raihan
Published: (2014) -
The Application of BIM to Project Cost Management
by: Ha lina
Published: (2021-01-01) -
Applying Fuzzy Data Mining to Improve Project CostEstimation at Early Stage
by: Yau-Sheng Jeng, et al.
Published: (2012) -
Developments in cost estimating and scheduling in BIM technology
Published: ()