The Cost and Benefit Evaluation of Beijing Mine Ecological Rehabilitation
碩士 === 國立交通大學 === 土木工程系所 === 104 === Mining will make the geomorphologic landscapes damaged, and induce a variety of geological and environmental hazards. These problems lead to the deterioration of the local ecological environments,and damaged geomorphologic landscapes and ecological environments s...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/55992546557638040297 |
id |
ndltd-TW-104NCTU5015041 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-104NCTU50150412017-09-06T04:21:58Z http://ndltd.ncl.edu.tw/handle/55992546557638040297 The Cost and Benefit Evaluation of Beijing Mine Ecological Rehabilitation 北京礦山復育工程之成本效益評估 Xie, De-Bao 謝德寶 碩士 國立交通大學 土木工程系所 104 Mining will make the geomorphologic landscapes damaged, and induce a variety of geological and environmental hazards. These problems lead to the deterioration of the local ecological environments,and damaged geomorphologic landscapes and ecological environments should be rehabilitated quickly. One of the important reasons for the difficulties in the implementation of ecological rehabilitation projects is that the benefits of rehabilitation projects are difficult to be evaluated accurately. The benefits of mine rehabilitation project include its economic benefits, social benefits and ecological benefits. In evaluating cost benefits, the traditional methods always focus on economic benefits, and seldom consider the ecological benefits and value. Therefore, it is the core issue in the paper that how to improve the traditional cost-benefit evaluation methods by quantifying the ecological benefits, in order to make the traditional methods suitable for the evaluation of the mine rehabilitation projects. In this paper, based on the research results on ecology——researches on ecological service pricing, the author begins with the economic benefits and ecological benefits of the mine rehabilitation project. The author regards the ecological service value as the outputs of the project in the ecological benefits, and establishes the estimation methods and evaluation indexes for each component of the ecological benefits, In this paper, the author also establishes an evaluation method of relative system.。Through the method, the efficiencies of the mine rehabilitation projects can be evaluated more accurately and finally provide support for the investment decisions of the mine rehabilitation project The 2015 rehabilitation plan on abandoned Mines in Beijing includes 9 sub-projects. In this paper, the author makes an evaluation and research on the cost benefits of the 2015 rehabilitation plan. The total investment in the rehabilitation project is 499 million Yuan (RMB). The evaluation period for the project is 30 years. It is expected that the comprehensive benefits will be 2609 million Yuan (RMB), among them, the ecological benefits account for 85% of the total benefits. Huang, Yu-Lin 黃玉霖 2016 學位論文 ; thesis 64 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立交通大學 === 土木工程系所 === 104 === Mining will make the geomorphologic landscapes damaged, and induce a variety of geological and environmental hazards. These problems lead to the deterioration of the local ecological environments,and damaged geomorphologic landscapes and ecological environments should be rehabilitated quickly. One of the important reasons for the difficulties in the implementation of ecological rehabilitation projects is that the benefits of rehabilitation projects are difficult to be evaluated accurately. The benefits of mine rehabilitation project include its economic benefits, social benefits and ecological benefits. In evaluating cost benefits, the traditional methods always focus on economic benefits, and seldom consider the ecological benefits and value. Therefore, it is the core issue in the paper that how to improve the traditional cost-benefit evaluation methods by quantifying the ecological benefits, in order to make the traditional methods suitable for the evaluation of the mine rehabilitation projects. In this paper, based on the research results on ecology——researches on ecological service pricing, the author begins with the economic benefits and ecological benefits of the mine rehabilitation project. The author regards the ecological service value as the outputs of the project in the ecological benefits, and establishes the estimation methods and evaluation indexes for each component of the ecological benefits, In this paper, the author also establishes an evaluation method of relative system.。Through the method, the efficiencies of the mine rehabilitation projects can be evaluated more accurately and finally provide support for the investment decisions of the mine rehabilitation project
The 2015 rehabilitation plan on abandoned Mines in Beijing includes 9 sub-projects. In this paper, the author makes an evaluation and research on the cost benefits of the 2015 rehabilitation plan. The total investment in the rehabilitation project is 499 million Yuan (RMB). The evaluation period for the project is 30 years. It is expected that the comprehensive benefits will be 2609 million Yuan (RMB), among them, the ecological benefits account for 85% of the total benefits.
|
author2 |
Huang, Yu-Lin |
author_facet |
Huang, Yu-Lin Xie, De-Bao 謝德寶 |
author |
Xie, De-Bao 謝德寶 |
spellingShingle |
Xie, De-Bao 謝德寶 The Cost and Benefit Evaluation of Beijing Mine Ecological Rehabilitation |
author_sort |
Xie, De-Bao |
title |
The Cost and Benefit Evaluation of Beijing Mine Ecological Rehabilitation |
title_short |
The Cost and Benefit Evaluation of Beijing Mine Ecological Rehabilitation |
title_full |
The Cost and Benefit Evaluation of Beijing Mine Ecological Rehabilitation |
title_fullStr |
The Cost and Benefit Evaluation of Beijing Mine Ecological Rehabilitation |
title_full_unstemmed |
The Cost and Benefit Evaluation of Beijing Mine Ecological Rehabilitation |
title_sort |
cost and benefit evaluation of beijing mine ecological rehabilitation |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/55992546557638040297 |
work_keys_str_mv |
AT xiedebao thecostandbenefitevaluationofbeijingmineecologicalrehabilitation AT xièdébǎo thecostandbenefitevaluationofbeijingmineecologicalrehabilitation AT xiedebao běijīngkuàngshānfùyùgōngchéngzhīchéngběnxiàoyìpínggū AT xièdébǎo běijīngkuàngshānfùyùgōngchéngzhīchéngběnxiàoyìpínggū AT xiedebao costandbenefitevaluationofbeijingmineecologicalrehabilitation AT xièdébǎo costandbenefitevaluationofbeijingmineecologicalrehabilitation |
_version_ |
1718527022593998848 |