An arc restoration scheduling problem for pipeline networks in post-disaster management
碩士 === 國立成功大學 === 資訊管理研究所 === 104 === Pipeline networks that ship flows of gas, water, electricity, or packets are important for supporting our daily livings. Suppose arcs of a pipeline network are damaged by disasters and the limited resources (equipment, manpower, and time) required to restore eac...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/59228317424221001527 |
id |
ndltd-TW-104NCKU5396027 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-104NCKU53960272017-10-29T04:35:12Z http://ndltd.ncl.edu.tw/handle/59228317424221001527 An arc restoration scheduling problem for pipeline networks in post-disaster management 災後管理之管線網路最佳節線修復排程研究 Ping-ChengLin 林秉錚 碩士 國立成功大學 資訊管理研究所 104 Pipeline networks that ship flows of gas, water, electricity, or packets are important for supporting our daily livings. Suppose arcs of a pipeline network are damaged by disasters and the limited resources (equipment, manpower, and time) required to restore each damaged arc have been estimated. We investigate the problem of when and who to restore which arcs such that the flows over pipelines become accessible for people among all arcs at minimum total waiting time in the post-disaster management. We first reduce the original network into an equivalent but smaller one where only damaged arcs are considered. Then, we propose two integer programs (Branch-and-Cut, Multicommodity Network Flows frameworks) for this special resource constrained project scheduling problem. Several valid inequalities are proposed to effectively shorten the computational time for integer programs. We also explain how to deal with more general cases where heterogeneous teams as well as their collaboration are considered for calculating an optimal network restoration schedule. Three fast heuristics are designed: Sequential Segment Heuristic (SSH), Greedy Tree method (GT), and Greedy Connected Component method (GCC), where SSH solves partitioned segments sequentially, and both GT and GCC first determine an arc restoration sequence in different greedy fashions and then assign tasks to different teams by a First-Come First-Served principle. We propose three variants of Genetic Algorithms (GA). Computational experiments indicate our heuristics could calculate solutions within 2% optimality gaps in seconds for large-scale networks. The GAs, on the other hand, perform a little worse with optimality gaps up to 5%. I-Lin Wang 王逸琳 2016 學位論文 ; thesis 88 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立成功大學 === 資訊管理研究所 === 104 === Pipeline networks that ship flows of gas, water, electricity, or packets are important for supporting our daily livings. Suppose arcs of a pipeline network are damaged by disasters and the limited resources (equipment, manpower, and time) required to restore each damaged arc have been estimated. We investigate the problem of when and who to restore which arcs such that the flows over pipelines become accessible for people among all arcs at minimum total waiting time in the post-disaster management. We first reduce the original network into an equivalent but smaller one where only damaged arcs are considered. Then, we propose two integer programs (Branch-and-Cut, Multicommodity Network Flows frameworks) for this special resource constrained project scheduling problem. Several valid inequalities are proposed to effectively shorten the computational time for integer programs. We also explain how to deal with more general cases where heterogeneous teams as well as their collaboration are considered for calculating an optimal network restoration schedule. Three fast heuristics are designed: Sequential Segment Heuristic (SSH), Greedy Tree method (GT), and Greedy Connected Component method (GCC), where SSH solves partitioned segments sequentially, and both GT and GCC first determine an arc restoration sequence in different greedy fashions and then assign tasks to different teams by a First-Come First-Served principle. We propose three variants of Genetic Algorithms (GA). Computational experiments indicate our heuristics could calculate solutions within 2% optimality gaps in seconds for large-scale networks. The GAs, on the other hand, perform a little worse with optimality gaps up to 5%.
|
author2 |
I-Lin Wang |
author_facet |
I-Lin Wang Ping-ChengLin 林秉錚 |
author |
Ping-ChengLin 林秉錚 |
spellingShingle |
Ping-ChengLin 林秉錚 An arc restoration scheduling problem for pipeline networks in post-disaster management |
author_sort |
Ping-ChengLin |
title |
An arc restoration scheduling problem for pipeline networks in post-disaster management |
title_short |
An arc restoration scheduling problem for pipeline networks in post-disaster management |
title_full |
An arc restoration scheduling problem for pipeline networks in post-disaster management |
title_fullStr |
An arc restoration scheduling problem for pipeline networks in post-disaster management |
title_full_unstemmed |
An arc restoration scheduling problem for pipeline networks in post-disaster management |
title_sort |
arc restoration scheduling problem for pipeline networks in post-disaster management |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/59228317424221001527 |
work_keys_str_mv |
AT pingchenglin anarcrestorationschedulingproblemforpipelinenetworksinpostdisastermanagement AT línbǐngzhēng anarcrestorationschedulingproblemforpipelinenetworksinpostdisastermanagement AT pingchenglin zāihòuguǎnlǐzhīguǎnxiànwǎnglùzuìjiājiéxiànxiūfùpáichéngyánjiū AT línbǐngzhēng zāihòuguǎnlǐzhīguǎnxiànwǎnglùzuìjiājiéxiànxiūfùpáichéngyánjiū AT pingchenglin arcrestorationschedulingproblemforpipelinenetworksinpostdisastermanagement AT línbǐngzhēng arcrestorationschedulingproblemforpipelinenetworksinpostdisastermanagement |
_version_ |
1718558153737502720 |