A study on the design management for public-owned buildings: The case of Rail station improvement in Hualien-Taitnug line railway

碩士 === 國立成功大學 === 建築學系碩士在職專班 === 104 === The railway station improvement project is national major construction which is characterized by urgent works progress and complicate construction interface. If the completion delay, the government will pay much more a painful price than traditional construc...

Full description

Bibliographic Details
Main Authors: Chien-HuaChen, 陳建華
Other Authors: Yao-Kuang Chen
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/fd5b7s
id ndltd-TW-104NCKU5222026
record_format oai_dc
spelling ndltd-TW-104NCKU52220262019-05-15T22:34:38Z http://ndltd.ncl.edu.tw/handle/fd5b7s A study on the design management for public-owned buildings: The case of Rail station improvement in Hualien-Taitnug line railway 公有建築設計管理問題實證研究-以花東線鐵路車站改善為例 Chien-HuaChen 陳建華 碩士 國立成功大學 建築學系碩士在職專班 104 The railway station improvement project is national major construction which is characterized by urgent works progress and complicate construction interface. If the completion delay, the government will pay much more a painful price than traditional construction project. Therefore, how to complete the project on schedule and demand is important for all participants in the project. Even though the authority in-charge is with rich experiences in national construction project, the policy changes during process lead to design alterations in several times, indirectly increasing the work load and affecting the scheduled completion. At present, our country is in urgent need of construction labors, and the national major construction project shall coordinate with the fast change of international business to regulate the domestic economic. The engineering characteristic can be controlled only by establishing the good management system, method and process to promote the operational efficiency and reduce the error of planning and design. The study aims to explore the problems existing in each mechanism by means of relevant design management theory, public construction design management mechanism, commissioned planning and design technology service subcontract mechanism, engineering procurement subcontract mechanism and existing issioned design management mechanism. In addition, the study takes an actual case to explore the authority in-charge requirements, design and engineering subcontract, budget control management, change design and engineering ement, and set forth a method to promote the project design management for the reference of authority in-charge, supervision unit and construction company in the implementation of public works construction. Key words: design management, engineering life cycle, progress management Yao-Kuang Chen 陳耀光 2016 學位論文 ; thesis 122 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 建築學系碩士在職專班 === 104 === The railway station improvement project is national major construction which is characterized by urgent works progress and complicate construction interface. If the completion delay, the government will pay much more a painful price than traditional construction project. Therefore, how to complete the project on schedule and demand is important for all participants in the project. Even though the authority in-charge is with rich experiences in national construction project, the policy changes during process lead to design alterations in several times, indirectly increasing the work load and affecting the scheduled completion. At present, our country is in urgent need of construction labors, and the national major construction project shall coordinate with the fast change of international business to regulate the domestic economic. The engineering characteristic can be controlled only by establishing the good management system, method and process to promote the operational efficiency and reduce the error of planning and design. The study aims to explore the problems existing in each mechanism by means of relevant design management theory, public construction design management mechanism, commissioned planning and design technology service subcontract mechanism, engineering procurement subcontract mechanism and existing issioned design management mechanism. In addition, the study takes an actual case to explore the authority in-charge requirements, design and engineering subcontract, budget control management, change design and engineering ement, and set forth a method to promote the project design management for the reference of authority in-charge, supervision unit and construction company in the implementation of public works construction. Key words: design management, engineering life cycle, progress management
author2 Yao-Kuang Chen
author_facet Yao-Kuang Chen
Chien-HuaChen
陳建華
author Chien-HuaChen
陳建華
spellingShingle Chien-HuaChen
陳建華
A study on the design management for public-owned buildings: The case of Rail station improvement in Hualien-Taitnug line railway
author_sort Chien-HuaChen
title A study on the design management for public-owned buildings: The case of Rail station improvement in Hualien-Taitnug line railway
title_short A study on the design management for public-owned buildings: The case of Rail station improvement in Hualien-Taitnug line railway
title_full A study on the design management for public-owned buildings: The case of Rail station improvement in Hualien-Taitnug line railway
title_fullStr A study on the design management for public-owned buildings: The case of Rail station improvement in Hualien-Taitnug line railway
title_full_unstemmed A study on the design management for public-owned buildings: The case of Rail station improvement in Hualien-Taitnug line railway
title_sort study on the design management for public-owned buildings: the case of rail station improvement in hualien-taitnug line railway
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/fd5b7s
work_keys_str_mv AT chienhuachen astudyonthedesignmanagementforpublicownedbuildingsthecaseofrailstationimprovementinhualientaitnuglinerailway
AT chénjiànhuá astudyonthedesignmanagementforpublicownedbuildingsthecaseofrailstationimprovementinhualientaitnuglinerailway
AT chienhuachen gōngyǒujiànzhúshèjìguǎnlǐwèntíshízhèngyánjiūyǐhuādōngxiàntiělùchēzhàngǎishànwèilì
AT chénjiànhuá gōngyǒujiànzhúshèjìguǎnlǐwèntíshízhèngyánjiūyǐhuādōngxiàntiělùchēzhàngǎishànwèilì
AT chienhuachen studyonthedesignmanagementforpublicownedbuildingsthecaseofrailstationimprovementinhualientaitnuglinerailway
AT chénjiànhuá studyonthedesignmanagementforpublicownedbuildingsthecaseofrailstationimprovementinhualientaitnuglinerailway
_version_ 1719132575839027200