The production plan for multi-site and multi-stage in LED industry

碩士 === 國立成功大學 === 工業與資訊管理學系碩士在職專班 === 104 === The thesis uses actual data from the LED industry to do the analysis. The purpose of the research is to allocate capacity efficiently and minimize cost. The production plan is mainly intended to solve the allocation problem for multi-site and multi-stage...

Full description

Bibliographic Details
Main Authors: Chen-YiFang, 方貞懿
Other Authors: Chin-Ho Lin
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/88820871365419456348
id ndltd-TW-104NCKU5041111
record_format oai_dc
spelling ndltd-TW-104NCKU50411112017-10-29T04:35:12Z http://ndltd.ncl.edu.tw/handle/88820871365419456348 The production plan for multi-site and multi-stage in LED industry LED產業多廠區多階層之投產規劃 Chen-YiFang 方貞懿 碩士 國立成功大學 工業與資訊管理學系碩士在職專班 104 The thesis uses actual data from the LED industry to do the analysis. The purpose of the research is to allocate capacity efficiently and minimize cost. The production plan is mainly intended to solve the allocation problem for multi-site and multi-stage production plans. According to the mathematical programming characteristics, such as MPS demand, the limitation of each production site, the upper and lower capacity bounds, production variable costs, transportation costs, and limits to the target production time, are formulated in the MP model for the case firm. A GA (genetic algorithm) is implemented to solve the proposed model and the near-optimal of the problem can be acquired using the GA. Furthermore, a sensitivity analysis is conducted to verify the parameters of the GA and it is found that the value set of the parameters can facilitate reaching the near-optimal solution. Chin-Ho Lin 林清河 2016 學位論文 ; thesis 56 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 工業與資訊管理學系碩士在職專班 === 104 === The thesis uses actual data from the LED industry to do the analysis. The purpose of the research is to allocate capacity efficiently and minimize cost. The production plan is mainly intended to solve the allocation problem for multi-site and multi-stage production plans. According to the mathematical programming characteristics, such as MPS demand, the limitation of each production site, the upper and lower capacity bounds, production variable costs, transportation costs, and limits to the target production time, are formulated in the MP model for the case firm. A GA (genetic algorithm) is implemented to solve the proposed model and the near-optimal of the problem can be acquired using the GA. Furthermore, a sensitivity analysis is conducted to verify the parameters of the GA and it is found that the value set of the parameters can facilitate reaching the near-optimal solution.
author2 Chin-Ho Lin
author_facet Chin-Ho Lin
Chen-YiFang
方貞懿
author Chen-YiFang
方貞懿
spellingShingle Chen-YiFang
方貞懿
The production plan for multi-site and multi-stage in LED industry
author_sort Chen-YiFang
title The production plan for multi-site and multi-stage in LED industry
title_short The production plan for multi-site and multi-stage in LED industry
title_full The production plan for multi-site and multi-stage in LED industry
title_fullStr The production plan for multi-site and multi-stage in LED industry
title_full_unstemmed The production plan for multi-site and multi-stage in LED industry
title_sort production plan for multi-site and multi-stage in led industry
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/88820871365419456348
work_keys_str_mv AT chenyifang theproductionplanformultisiteandmultistageinledindustry
AT fāngzhēnyì theproductionplanformultisiteandmultistageinledindustry
AT chenyifang ledchǎnyèduōchǎngqūduōjiēcéngzhītóuchǎnguīhuà
AT fāngzhēnyì ledchǎnyèduōchǎngqūduōjiēcéngzhītóuchǎnguīhuà
AT chenyifang productionplanformultisiteandmultistageinledindustry
AT fāngzhēnyì productionplanformultisiteandmultistageinledindustry
_version_ 1718558056498855936