Preliminary Study of Potential Development on Groundwater Resource from Reservoir Seepage
碩士 === 國立成功大學 === 土木工程學系碩士在職專班 === 104 === Taiwan is a densely populated country with steep terrain. After raining, most of rain run directly into sea from the surface. In addition, the uneven distribution of rainfall makes less use of the alluvial plain from the geological characteristics of the aq...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/883bqy |
id |
ndltd-TW-104NCKU5015092 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-104NCKU50150922019-05-15T22:54:12Z http://ndltd.ncl.edu.tw/handle/883bqy Preliminary Study of Potential Development on Groundwater Resource from Reservoir Seepage 水庫滲流對地下水資源開發潛能之初步研究 Hao-TingTing 丁浩庭 碩士 國立成功大學 土木工程學系碩士在職專班 104 Taiwan is a densely populated country with steep terrain. After raining, most of rain run directly into sea from the surface. In addition, the uneven distribution of rainfall makes less use of the alluvial plain from the geological characteristics of the aquifer. Toward the regulation and storage that caused the actual amount of water is only 26% available use from the yearly rainfall, though the average annual rainfall in Taiwan, which is 2,500 mm about 2.5 times average figure of the world, the available water resources allocated for all population in Taiwan is only 15% of the earth, ranked 18th water shortage in the world. The preliminary study of potential development on groundwater resource from Fengshan Reservoir is selected as a case. The hydrogeological conceptual model was firstly established through the analysis of a three-dimensional groundwater model, then calculated the amount of groundwater gained from reservoir seepage and assessed groundwater resource for the feasibility of development. Simulation results show that water level of the reservoir produces groundwater recharge capacity from the Fengshan Reservoir seepage of 46,975 CMD in 2010. The five purposed levels simulated scenario viz; the lowest water level; the dead storage level; the approved discharge level; the pre-lifted water level and the designed water level were simulated to the groundwater recharge amount as followings 27,397 CMD, 31,587 CMD, 41,246 CMD, 49,078 CMD and 55,497 CMD in sequence. Jing-Wen Chen 陳景文 2016 學位論文 ; thesis 65 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立成功大學 === 土木工程學系碩士在職專班 === 104 === Taiwan is a densely populated country with steep terrain. After raining, most of rain run directly into sea from the surface. In addition, the uneven distribution of rainfall makes less use of the alluvial plain from the geological characteristics of the aquifer. Toward the regulation and storage that caused the actual amount of water is only 26% available use from the yearly rainfall, though the average annual rainfall in Taiwan, which is 2,500 mm about 2.5 times average figure of the world, the available water resources allocated for all population in Taiwan is only 15% of the earth, ranked 18th water shortage in the world. The preliminary study of potential development on groundwater resource from Fengshan Reservoir is selected as a case. The hydrogeological conceptual model was firstly established through the analysis of a three-dimensional groundwater model, then calculated the amount of groundwater gained from reservoir seepage and assessed groundwater resource for the feasibility of development. Simulation results show that water level of the reservoir produces groundwater recharge capacity from the Fengshan Reservoir seepage of 46,975 CMD in 2010. The five purposed levels simulated scenario viz; the lowest water level; the dead storage level; the approved discharge level; the pre-lifted water level and the designed water level were simulated to the groundwater recharge amount as followings 27,397 CMD, 31,587 CMD, 41,246 CMD, 49,078 CMD and 55,497 CMD in sequence.
|
author2 |
Jing-Wen Chen |
author_facet |
Jing-Wen Chen Hao-TingTing 丁浩庭 |
author |
Hao-TingTing 丁浩庭 |
spellingShingle |
Hao-TingTing 丁浩庭 Preliminary Study of Potential Development on Groundwater Resource from Reservoir Seepage |
author_sort |
Hao-TingTing |
title |
Preliminary Study of Potential Development on Groundwater Resource from Reservoir Seepage |
title_short |
Preliminary Study of Potential Development on Groundwater Resource from Reservoir Seepage |
title_full |
Preliminary Study of Potential Development on Groundwater Resource from Reservoir Seepage |
title_fullStr |
Preliminary Study of Potential Development on Groundwater Resource from Reservoir Seepage |
title_full_unstemmed |
Preliminary Study of Potential Development on Groundwater Resource from Reservoir Seepage |
title_sort |
preliminary study of potential development on groundwater resource from reservoir seepage |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/883bqy |
work_keys_str_mv |
AT haotingting preliminarystudyofpotentialdevelopmentongroundwaterresourcefromreservoirseepage AT dīnghàotíng preliminarystudyofpotentialdevelopmentongroundwaterresourcefromreservoirseepage AT haotingting shuǐkùshènliúduìdexiàshuǐzīyuánkāifāqiánnéngzhīchūbùyánjiū AT dīnghàotíng shuǐkùshènliúduìdexiàshuǐzīyuánkāifāqiánnéngzhīchūbùyánjiū |
_version_ |
1719137201445404672 |