Random Sampling Verification On Project Scheduling

碩士 === 嶺東科技大學 === 資訊管理系碩士班 === 104 === Project management has gained an increasingly important position in modern organizations. The most widely used technique for managing project schedule since its origin in the 1950s, the well known as Program Evaluation and Review Technique/Critical Path Metho...

Full description

Bibliographic Details
Main Authors: JUNG,YI-SHIUE, 鍾易學
Other Authors: SHEEN,QUEN-YAW
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/92322095567293844616
id ndltd-TW-104LTC00395003
record_format oai_dc
spelling ndltd-TW-104LTC003950032017-05-27T04:35:41Z http://ndltd.ncl.edu.tw/handle/92322095567293844616 Random Sampling Verification On Project Scheduling 專案工期抽樣模擬驗證 JUNG,YI-SHIUE 鍾易學 碩士 嶺東科技大學 資訊管理系碩士班 104 Project management has gained an increasingly important position in modern organizations. The most widely used technique for managing project schedule since its origin in the 1950s, the well known as Program Evaluation and Review Technique/Critical Path Method (PERT/CPM) , has not been significantly modified and improved either in its application or its assumptions. After application using these methods, the statistical data shows that a lot of the project quality was low, the project was delivered late or the budget was exceeded. Since 1970, the Critical Chain (CC) method applies Theory of Constraints (TOC)-based thinking process developed by Dr. Goldratt to project management. Application of CC method in industries has been proven as successful. The purpose of this study is to verify the suitability and the constraints of the traditional PERT and CPM methods. This study introduce a random sampling method to simulate the inherent endurance uncertainty of activities. In this study, we proposed normal, right-skewed, and left-skewed distribution for modeling activities’ execution time. Our discourse compares systematically among the sampling simulation, PERT, and CPM to reveal the differences among these three approaches. We conclude that the proposed method in this study not only can completely verify the PERT and CPM approaches both are not fit for the merging effects calculation ,but also the merging effect is due to the expected value of the merging activity duration time. SHEEN,QUEN-YAW 沈坤耀 2016 學位論文 ; thesis 98 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 嶺東科技大學 === 資訊管理系碩士班 === 104 === Project management has gained an increasingly important position in modern organizations. The most widely used technique for managing project schedule since its origin in the 1950s, the well known as Program Evaluation and Review Technique/Critical Path Method (PERT/CPM) , has not been significantly modified and improved either in its application or its assumptions. After application using these methods, the statistical data shows that a lot of the project quality was low, the project was delivered late or the budget was exceeded. Since 1970, the Critical Chain (CC) method applies Theory of Constraints (TOC)-based thinking process developed by Dr. Goldratt to project management. Application of CC method in industries has been proven as successful. The purpose of this study is to verify the suitability and the constraints of the traditional PERT and CPM methods. This study introduce a random sampling method to simulate the inherent endurance uncertainty of activities. In this study, we proposed normal, right-skewed, and left-skewed distribution for modeling activities’ execution time. Our discourse compares systematically among the sampling simulation, PERT, and CPM to reveal the differences among these three approaches. We conclude that the proposed method in this study not only can completely verify the PERT and CPM approaches both are not fit for the merging effects calculation ,but also the merging effect is due to the expected value of the merging activity duration time.
author2 SHEEN,QUEN-YAW
author_facet SHEEN,QUEN-YAW
JUNG,YI-SHIUE
鍾易學
author JUNG,YI-SHIUE
鍾易學
spellingShingle JUNG,YI-SHIUE
鍾易學
Random Sampling Verification On Project Scheduling
author_sort JUNG,YI-SHIUE
title Random Sampling Verification On Project Scheduling
title_short Random Sampling Verification On Project Scheduling
title_full Random Sampling Verification On Project Scheduling
title_fullStr Random Sampling Verification On Project Scheduling
title_full_unstemmed Random Sampling Verification On Project Scheduling
title_sort random sampling verification on project scheduling
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/92322095567293844616
work_keys_str_mv AT jungyishiue randomsamplingverificationonprojectscheduling
AT zhōngyìxué randomsamplingverificationonprojectscheduling
AT jungyishiue zhuānàngōngqīchōuyàngmónǐyànzhèng
AT zhōngyìxué zhuānàngōngqīchōuyàngmónǐyànzhèng
_version_ 1718454015572836352