Production Lot Sizing Problem for System with Outsourcing and Rework, and System with Breakdown, Rework, Backordering and Service Levels
碩士 === 朝陽科技大學 === 企業管理系 === 104
Main Authors: | Chen-Ju Liu, 劉晨如 |
---|---|
Other Authors: | Sin-Ga Wang |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/57118769680493116410 |
Similar Items
-
Optimal Replenishment Problems for System with Breakdown, Backordering and Service Level, and Partial Rework-able, and System with Adjustable Production Rate and Partial Rework-able
by: CHEN, Yu-Ru, et al.
Published: (2016) -
Optimization of Lot Size Decisions for System with Outsourcing and Partial Rework-Able, and System with Breakdown, Backlogging and Service Levels, Multi-delivery and Partial Rework-Able.
by: LI, YI-YING, et al.
Published: (2016) -
Optimal production runs time for an EPQ model with machine breakdowns, rework process and backordering
by: Hsien-Ju Chuang, et al.
Published: (2007) -
Exploration Optimal of the Common Cycle Time and Shipping Policy for a Multi-item Fabrication System with Outsourcing and Rework, and Fabrication Run Time with Breakdown, Outsourcing and Rework
by: CHEN, HUI-CUN, et al.
Published: (2019) -
A research for an optimal JIT production and delivery lot size with rework
by: Ching-Yang Chang, et al.
Published: (2006)