Risk Assessment on 22kV Load Transfer Cable Sheath Under N-2 of 161kV Main Substations for Wen-Hu Line
碩士 === 中原大學 === 電機工程研究所 === 104 === Taipei Rapid Transit Corporation (TRTC) plans to increase the power supply reliability of 161kV Bulk Supply Substation (BSS) of Wenhu Line by upgrading original N-1 to N-2 design criterion. The former refers to the power system design which allows the outage of on...
Main Authors: | Hisn-Fu Lin, 林信甫 |
---|---|
Other Authors: | Shi-Lin Chen |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/60538785156576515276 |
Similar Items
-
Fault Location and Simulation For 161kV Underground Cable
by: Chia-Han Li, et al.
Published: (2011) -
Analysis of the Current for 161kV XLPE Underground Cable
by: Fu-Yuan Chang, et al.
Published: (2001) -
Analysis of Switching Surge for 161kV XLPE Underground Cable
by: Ming-Yi Jhou, et al.
Published: (2011) -
Analysis of the Influence of Switching Surge on Transformer in 161kV Side of Generation Substation
by: CHEN, YEN-CHENG, et al.
Published: (2018) -
A Study on 161 kV GIS Disconnector Switching Transients of Distribution Substation
by: Lain-Deng Chen, et al.
Published: (2009)