Risk Assessment on 22kV Load Transfer Cable Sheath Under N-2 of 161kV Main Substations for Wen-Hu Line

碩士 === 中原大學 === 電機工程研究所 === 104 === Taipei Rapid Transit Corporation (TRTC) plans to increase the power supply reliability of 161kV Bulk Supply Substation (BSS) of Wenhu Line by upgrading original N-1 to N-2 design criterion. The former refers to the power system design which allows the outage of on...

Full description

Bibliographic Details
Main Authors: Hisn-Fu Lin, 林信甫
Other Authors: Shi-Lin Chen
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/60538785156576515276