Analysis and Prediction of Jacking Force

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 103 === Slurry Pressure Balance Machine (SPBM) uses a mix of bentonite and water to remove the excavated soil. The slurry and muck is pumped out of the tunnel to a separation plant at the surface, where the muck is separated from the slurry and the slurry is reused w...

Full description

Bibliographic Details
Main Authors: Haung Hui-Wen, 黃惠文
Other Authors: 倪至寬
Format: Others
Language:zh-TW
Online Access:http://ndltd.ncl.edu.tw/handle/742ug2
id ndltd-TW-103TIT05653005
record_format oai_dc
spelling ndltd-TW-103TIT056530052019-06-28T05:25:01Z http://ndltd.ncl.edu.tw/handle/742ug2 Analysis and Prediction of Jacking Force 推管工程的元押推進力探討 Haung Hui-Wen 黃惠文 碩士 國立臺北科技大學 土木與防災研究所 103 Slurry Pressure Balance Machine (SPBM) uses a mix of bentonite and water to remove the excavated soil. The slurry and muck is pumped out of the tunnel to a separation plant at the surface, where the muck is separated from the slurry and the slurry is reused within the slurry system. The pressure of the slurry is used to balance the groundwater and face pressure, ensuring a watertight head at the front of the TBM. During the pipe jacking, the jacking force is an important parameter, Theoretically, jacking force is the total needed forces to overcome on frictional resistance around pipe string and assumed face pressure is a constant, but in this paper, The main component of the jacking force is due to face pressure, When the lubrication used, the frictional resistance can be reduced from 45 to 90%. The jacking Force controlled by the soil type、misalignment of the pipes、lubricant using and work stoppage...etc. This paper discusses four methods of prediction jacking force during a slurry pipe jacking construction and make those conclusions : (1). Annular space is stabilized with sufficient amount of lubricant and pipe weight is less than buoyancy, resulting in no direct contact between pipe and ground soil. Any local variation of jacking force is caused either by face pressure due to driving from coarse soil to fine soil or wood encountered. (2). If deviation is more than thresh hold value of 60 mm, the friction force between pipe and ground soil increase. This effect is cumulative and remains constant in the drive. 倪至寬 學位論文 ; thesis 0 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺北科技大學 === 土木與防災研究所 === 103 === Slurry Pressure Balance Machine (SPBM) uses a mix of bentonite and water to remove the excavated soil. The slurry and muck is pumped out of the tunnel to a separation plant at the surface, where the muck is separated from the slurry and the slurry is reused within the slurry system. The pressure of the slurry is used to balance the groundwater and face pressure, ensuring a watertight head at the front of the TBM. During the pipe jacking, the jacking force is an important parameter, Theoretically, jacking force is the total needed forces to overcome on frictional resistance around pipe string and assumed face pressure is a constant, but in this paper, The main component of the jacking force is due to face pressure, When the lubrication used, the frictional resistance can be reduced from 45 to 90%. The jacking Force controlled by the soil type、misalignment of the pipes、lubricant using and work stoppage...etc. This paper discusses four methods of prediction jacking force during a slurry pipe jacking construction and make those conclusions : (1). Annular space is stabilized with sufficient amount of lubricant and pipe weight is less than buoyancy, resulting in no direct contact between pipe and ground soil. Any local variation of jacking force is caused either by face pressure due to driving from coarse soil to fine soil or wood encountered. (2). If deviation is more than thresh hold value of 60 mm, the friction force between pipe and ground soil increase. This effect is cumulative and remains constant in the drive.
author2 倪至寬
author_facet 倪至寬
Haung Hui-Wen
黃惠文
author Haung Hui-Wen
黃惠文
spellingShingle Haung Hui-Wen
黃惠文
Analysis and Prediction of Jacking Force
author_sort Haung Hui-Wen
title Analysis and Prediction of Jacking Force
title_short Analysis and Prediction of Jacking Force
title_full Analysis and Prediction of Jacking Force
title_fullStr Analysis and Prediction of Jacking Force
title_full_unstemmed Analysis and Prediction of Jacking Force
title_sort analysis and prediction of jacking force
url http://ndltd.ncl.edu.tw/handle/742ug2
work_keys_str_mv AT haunghuiwen analysisandpredictionofjackingforce
AT huánghuìwén analysisandpredictionofjackingforce
AT haunghuiwen tuīguǎngōngchéngdeyuányātuījìnlìtàntǎo
AT huánghuìwén tuīguǎngōngchéngdeyuányātuījìnlìtàntǎo
_version_ 1719213867098177536