Total Production Management Kaizen Event– Case Study of Enhance Aircraft Engine Component repair Company

碩士 === 國立臺灣科技大學 === 工業管理系 === 103 === The competence of an enterprise is determined by its internal communication efficiency, product quality, innovation, and customer satisfaction. For achieving better production management, it is necessary to increase productivity, improve product quality and redu...

Full description

Bibliographic Details
Main Authors: Hsuan-Ming Hsu, 許軒銘
Other Authors: Shi-Woei Lin
Format: Others
Language:zh-TW
Published: 2015
Online Access:http://ndltd.ncl.edu.tw/handle/5pgp52
id ndltd-TW-103NTUS5041119
record_format oai_dc
spelling ndltd-TW-103NTUS50411192019-05-15T22:17:44Z http://ndltd.ncl.edu.tw/handle/5pgp52 Total Production Management Kaizen Event– Case Study of Enhance Aircraft Engine Component repair Company 全面生產管理改善活動-以飛機發動機零件維修公司之個案探討 Hsuan-Ming Hsu 許軒銘 碩士 國立臺灣科技大學 工業管理系 103 The competence of an enterprise is determined by its internal communication efficiency, product quality, innovation, and customer satisfaction. For achieving better production management, it is necessary to increase productivity, improve product quality and reduce costs. Except the above-mentioned factors, another important consideration for an engine overhaul company is how to reduce lead time to customer and let them can on-time install engine to running. The engine price of Airbus 320, the most popular airplane in 2014, is about USD 10,000,000. For Aviation companies, controlling cash flow by reducing engine stock and by increasing engine’s utilization rate is thus critical. The AT Company was founded in Taiwan more than 20 years ago. However, some of their core machines cannot be replaced for some reasons. It is a challenge for the production unit of AT Company to use the tools of total production management to perform preventive management on machines with unplanned downtime, core machines and share resources. This research uses tools of lean process to solve unplanned down time issue by categorized equipment, build up daily walk around list and D.I.V.E.(Define、Investigate、Verify、Ensure). This thesis uses AT company’s vacuum furnace as an example to introduce D.I.V.E. tools to reduce the risk of machine stop due to aging and provide teaching guidance for the enterprise when they promote the lean processes. Shi-Woei Lin 林希偉 2015 學位論文 ; thesis 86 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 工業管理系 === 103 === The competence of an enterprise is determined by its internal communication efficiency, product quality, innovation, and customer satisfaction. For achieving better production management, it is necessary to increase productivity, improve product quality and reduce costs. Except the above-mentioned factors, another important consideration for an engine overhaul company is how to reduce lead time to customer and let them can on-time install engine to running. The engine price of Airbus 320, the most popular airplane in 2014, is about USD 10,000,000. For Aviation companies, controlling cash flow by reducing engine stock and by increasing engine’s utilization rate is thus critical. The AT Company was founded in Taiwan more than 20 years ago. However, some of their core machines cannot be replaced for some reasons. It is a challenge for the production unit of AT Company to use the tools of total production management to perform preventive management on machines with unplanned downtime, core machines and share resources. This research uses tools of lean process to solve unplanned down time issue by categorized equipment, build up daily walk around list and D.I.V.E.(Define、Investigate、Verify、Ensure). This thesis uses AT company’s vacuum furnace as an example to introduce D.I.V.E. tools to reduce the risk of machine stop due to aging and provide teaching guidance for the enterprise when they promote the lean processes.
author2 Shi-Woei Lin
author_facet Shi-Woei Lin
Hsuan-Ming Hsu
許軒銘
author Hsuan-Ming Hsu
許軒銘
spellingShingle Hsuan-Ming Hsu
許軒銘
Total Production Management Kaizen Event– Case Study of Enhance Aircraft Engine Component repair Company
author_sort Hsuan-Ming Hsu
title Total Production Management Kaizen Event– Case Study of Enhance Aircraft Engine Component repair Company
title_short Total Production Management Kaizen Event– Case Study of Enhance Aircraft Engine Component repair Company
title_full Total Production Management Kaizen Event– Case Study of Enhance Aircraft Engine Component repair Company
title_fullStr Total Production Management Kaizen Event– Case Study of Enhance Aircraft Engine Component repair Company
title_full_unstemmed Total Production Management Kaizen Event– Case Study of Enhance Aircraft Engine Component repair Company
title_sort total production management kaizen event– case study of enhance aircraft engine component repair company
publishDate 2015
url http://ndltd.ncl.edu.tw/handle/5pgp52
work_keys_str_mv AT hsuanminghsu totalproductionmanagementkaizeneventcasestudyofenhanceaircraftenginecomponentrepaircompany
AT xǔxuānmíng totalproductionmanagementkaizeneventcasestudyofenhanceaircraftenginecomponentrepaircompany
AT hsuanminghsu quánmiànshēngchǎnguǎnlǐgǎishànhuódòngyǐfēijīfādòngjīlíngjiànwéixiūgōngsīzhīgèàntàntǎo
AT xǔxuānmíng quánmiànshēngchǎnguǎnlǐgǎishànhuódòngyǐfēijīfādòngjīlíngjiànwéixiūgōngsīzhīgèàntàntǎo
_version_ 1719128069164236800