Sequential risk decision process: Reference Point Formation and Adaptation in Balloon Analogue Risk Task

碩士 === 國立臺灣大學 === 經濟學研究所 === 103 === The main idea of this article is to find formation and adaptation of reference point in sequential risk decision process by the psychological experimental method, the Balloon Analogue Risk Task(BART). According to Koszegi and Rabin(2006), reference point is a per...

Full description

Bibliographic Details
Main Authors: Pei-Hsun Hsieh, 謝沛勳
Other Authors: 黃貞穎
Format: Others
Language:zh-TW
Published: 2015
Online Access:http://ndltd.ncl.edu.tw/handle/19104646221151100287
id ndltd-TW-103NTU05389021
record_format oai_dc
spelling ndltd-TW-103NTU053890212016-11-19T04:09:21Z http://ndltd.ncl.edu.tw/handle/19104646221151100287 Sequential risk decision process: Reference Point Formation and Adaptation in Balloon Analogue Risk Task 連續風險決策過程之研究:由類風險氣球實驗研究參考點之形成與轉移 Pei-Hsun Hsieh 謝沛勳 碩士 國立臺灣大學 經濟學研究所 103 The main idea of this article is to find formation and adaptation of reference point in sequential risk decision process by the psychological experimental method, the Balloon Analogue Risk Task(BART). According to Koszegi and Rabin(2006), reference point is a person''s lagged expectation, formed after situation arose a period. We consider that when situation changed, DM''s reference point will change his/her expectation in old situation to the expectation in new situation gradually. In our experiment, a subject get a balloon with zero value in the beginning, which must be pumped, cashed, or done nothing at every moments. The balloon is enlarged when it gets pumped by the subject, and the value of it is proportional to its size. There is a probability that the balloon will explode by getting pumped. If the subject cashes the balloon before explosion, he/she can get the value of balloon. We have three groups in our experiment, (i)control group(one balloon), (ii)intermediate goal group, (iii)two balloons group. We want to find that when we set an intermediate goal in a trial, subjects tend to cash the balloon earlier to avoid risk explosion. On the other hand, we want to find that when subjects loss value (by balloon explosion) in two balloons group, subjects tend to cash balloon later to get more reward. 黃貞穎 2015 學位論文 ; thesis 31 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 經濟學研究所 === 103 === The main idea of this article is to find formation and adaptation of reference point in sequential risk decision process by the psychological experimental method, the Balloon Analogue Risk Task(BART). According to Koszegi and Rabin(2006), reference point is a person''s lagged expectation, formed after situation arose a period. We consider that when situation changed, DM''s reference point will change his/her expectation in old situation to the expectation in new situation gradually. In our experiment, a subject get a balloon with zero value in the beginning, which must be pumped, cashed, or done nothing at every moments. The balloon is enlarged when it gets pumped by the subject, and the value of it is proportional to its size. There is a probability that the balloon will explode by getting pumped. If the subject cashes the balloon before explosion, he/she can get the value of balloon. We have three groups in our experiment, (i)control group(one balloon), (ii)intermediate goal group, (iii)two balloons group. We want to find that when we set an intermediate goal in a trial, subjects tend to cash the balloon earlier to avoid risk explosion. On the other hand, we want to find that when subjects loss value (by balloon explosion) in two balloons group, subjects tend to cash balloon later to get more reward.
author2 黃貞穎
author_facet 黃貞穎
Pei-Hsun Hsieh
謝沛勳
author Pei-Hsun Hsieh
謝沛勳
spellingShingle Pei-Hsun Hsieh
謝沛勳
Sequential risk decision process: Reference Point Formation and Adaptation in Balloon Analogue Risk Task
author_sort Pei-Hsun Hsieh
title Sequential risk decision process: Reference Point Formation and Adaptation in Balloon Analogue Risk Task
title_short Sequential risk decision process: Reference Point Formation and Adaptation in Balloon Analogue Risk Task
title_full Sequential risk decision process: Reference Point Formation and Adaptation in Balloon Analogue Risk Task
title_fullStr Sequential risk decision process: Reference Point Formation and Adaptation in Balloon Analogue Risk Task
title_full_unstemmed Sequential risk decision process: Reference Point Formation and Adaptation in Balloon Analogue Risk Task
title_sort sequential risk decision process: reference point formation and adaptation in balloon analogue risk task
publishDate 2015
url http://ndltd.ncl.edu.tw/handle/19104646221151100287
work_keys_str_mv AT peihsunhsieh sequentialriskdecisionprocessreferencepointformationandadaptationinballoonanaloguerisktask
AT xièpèixūn sequentialriskdecisionprocessreferencepointformationandadaptationinballoonanaloguerisktask
AT peihsunhsieh liánxùfēngxiǎnjuécèguòchéngzhīyánjiūyóulèifēngxiǎnqìqiúshíyànyánjiūcānkǎodiǎnzhīxíngchéngyǔzhuǎnyí
AT xièpèixūn liánxùfēngxiǎnjuécèguòchéngzhīyánjiūyóulèifēngxiǎnqìqiúshíyànyánjiūcānkǎodiǎnzhīxíngchéngyǔzhuǎnyí
_version_ 1718394320261742592