A Study of Community Resident’s Living Adjustment After Mega Disaster - A Case Study Based on the Reconstruction of Rinari Tribes in Pingtung County
碩士 === 國立中山大學 === 公共事務管理研究所 === 103 === Typhoon Morakot brought extreme amount of rain which triggered severe flooding throughout the southern-central and southeastern Taiwan during August 6 and August 10, 2009. Morakot wrought catastrophic damage in the relatively resource scarce indigenous tribes...
Main Authors: | Chia-yin Tan, 譚佳音 |
---|---|
Other Authors: | Dr.Jui-kun Kuo |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/j5f6sz |
Similar Items
-
The Construction of Pingtung Rinari Dashe Tribe Cultural Craft Industry
by: CHEN, QING-LIN, et al.
Published: (2016) -
A Study on the Post Disaster Village Relocation at the Town of Rinari in Majia Township Pingtung County
by: TORBORS,CHYUAN, et al.
Published: (2018) -
Planning and Design Healing Garden of Tribal Rinari in Pingtung County
by: YiyinLin, et al.
Published: (2013) -
Investigating the Development of Post-Disaster Industrial Reconstruction: A Case in Rinari
by: HSU,HUI-CHUAN, et al.
Published: (2014) -
The Indigenous Knowledge and the Interpretation of Culture in the Reconstruction Processes in Rinari
by: Valagas Gadeljeman, et al.
Published: (2014)