The Study of Contract Implementation in Design-Build Model for Rapid Transit System - the case of Kaohsiung Circle Line LRT Project (Phase1)
碩士 === 國立高雄第一科技大學 === 營建工程研究所 === 103 === The research used the circle line turnkey project (phase I) of Kaohsiung LRT as a case study, that is the first light rail transit (LRT) construction in Taiwan, to investigate problems during the contract implementation, through interviewed with the rail-rel...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/r6tfsj |
id |
ndltd-TW-103NKIT5512019 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-103NKIT55120192019-05-15T21:59:10Z http://ndltd.ncl.edu.tw/handle/r6tfsj The Study of Contract Implementation in Design-Build Model for Rapid Transit System - the case of Kaohsiung Circle Line LRT Project (Phase1) 捷運系統採統包模式對於契約執行之探討-以高雄環狀輕軌捷運建設(第一階段)為例 Shao-Tzu Kao 高紹慈 碩士 國立高雄第一科技大學 營建工程研究所 103 The research used the circle line turnkey project (phase I) of Kaohsiung LRT as a case study, that is the first light rail transit (LRT) construction in Taiwan, to investigate problems during the contract implementation, through interviewed with the rail-related professionals, to know how to improve tendering procedure of LRT construction in the future. Research methods include analysis of literatures and interviews, by interviewed the experts of owners, project consultant management, supervision and contractors who have been participated the circle line design-build project (phase I) of Kaohsiung LRT, to research and analysis the the project status during construction. According to the results of expert interviews, the countermeasures for the tendering phase of the LRT project includes three sections: tendering strategies, requests for proposals, and procurement contracts. Pursuant to the statistics from the proposed countermeasures, a majority of the experts believed that the basis for the base price should not be set by the most advantageous tender; tenderers should clearly specify relevant case history; a detailing design consultant should be contracted out to reduce interface disputes; milestones should be set for detailing design, the detailing design phase should implement schedule controls to reduce project delay risks and unforeseen domestic projects, reference foreign examples, and relevant personnel talent should be cultivated. Experts also proposed that when track works and substandard works are constructed by the same contractor, the designer should send personnel to the site and establish the terms for alternative requirements for sub-contractors. Case in this study was a domestic project undertaken by a foreign contractor for the first time. The foreign contractor was unfamiliar with Taiwan’s laws and regulations, and domestic contractors did not understand LRT construction projects. In addition, the division of labor of the contractor was too detailed, thus many interface problems arose to affect contract implementation effectiveness. As prevention is better than cure, if problems were solved effectively with relevant methods and mechanisms in advance by reinforcing schedule control at the design phase, problems would have been discovered and relevant barriers would have been overcome in advance to benefit the overall construction progress of the LRT project. This study hopes to provide countermeasures for LRT contract implementation, so as to benefit the development of technical integration capability and overall schedule control for future development of LRT projects in Taiwan. Jen-Rong Lee 李振榮 2015 學位論文 ; thesis 126 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立高雄第一科技大學 === 營建工程研究所 === 103 === The research used the circle line turnkey project (phase I) of Kaohsiung LRT as a case study, that is the first light rail transit (LRT) construction in Taiwan, to investigate problems during the contract implementation, through interviewed with the rail-related professionals, to know how to improve tendering procedure of LRT construction in the future. Research methods include analysis of literatures and interviews, by interviewed the experts of owners, project consultant management, supervision and contractors who have been participated the circle line design-build project (phase I) of Kaohsiung LRT, to research and analysis the the project status during construction.
According to the results of expert interviews, the countermeasures for the tendering phase of the LRT project includes three sections: tendering strategies, requests for proposals, and procurement contracts. Pursuant to the statistics from the proposed countermeasures, a majority of the experts believed that the basis for the base price should not be set by the most advantageous tender; tenderers should clearly specify relevant case history; a detailing design consultant should be contracted out to reduce interface disputes; milestones should be set for detailing design, the detailing design phase should implement schedule controls to reduce project delay risks and unforeseen domestic projects, reference foreign examples, and relevant personnel talent should be cultivated. Experts also proposed that when track works and substandard works are constructed by the same contractor, the designer should send personnel to the site and establish the terms for alternative requirements for sub-contractors.
Case in this study was a domestic project undertaken by a foreign contractor for the first time. The foreign contractor was unfamiliar with Taiwan’s laws and regulations, and domestic contractors did not understand LRT construction projects. In addition, the division of labor of the contractor was too detailed, thus many interface problems arose to affect contract implementation effectiveness. As prevention is better than cure, if problems were solved effectively with relevant methods and mechanisms in advance by reinforcing schedule control at the design phase, problems would have been discovered and relevant barriers would have been overcome in advance to benefit the overall construction progress of the LRT project. This study hopes to provide countermeasures for LRT contract implementation, so as to benefit the development of technical integration capability and overall schedule control for future development of LRT projects in Taiwan.
|
author2 |
Jen-Rong Lee |
author_facet |
Jen-Rong Lee Shao-Tzu Kao 高紹慈 |
author |
Shao-Tzu Kao 高紹慈 |
spellingShingle |
Shao-Tzu Kao 高紹慈 The Study of Contract Implementation in Design-Build Model for Rapid Transit System - the case of Kaohsiung Circle Line LRT Project (Phase1) |
author_sort |
Shao-Tzu Kao |
title |
The Study of Contract Implementation in Design-Build Model for Rapid Transit System - the case of Kaohsiung Circle Line LRT Project (Phase1) |
title_short |
The Study of Contract Implementation in Design-Build Model for Rapid Transit System - the case of Kaohsiung Circle Line LRT Project (Phase1) |
title_full |
The Study of Contract Implementation in Design-Build Model for Rapid Transit System - the case of Kaohsiung Circle Line LRT Project (Phase1) |
title_fullStr |
The Study of Contract Implementation in Design-Build Model for Rapid Transit System - the case of Kaohsiung Circle Line LRT Project (Phase1) |
title_full_unstemmed |
The Study of Contract Implementation in Design-Build Model for Rapid Transit System - the case of Kaohsiung Circle Line LRT Project (Phase1) |
title_sort |
study of contract implementation in design-build model for rapid transit system - the case of kaohsiung circle line lrt project (phase1) |
publishDate |
2015 |
url |
http://ndltd.ncl.edu.tw/handle/r6tfsj |
work_keys_str_mv |
AT shaotzukao thestudyofcontractimplementationindesignbuildmodelforrapidtransitsystemthecaseofkaohsiungcirclelinelrtprojectphase1 AT gāoshàocí thestudyofcontractimplementationindesignbuildmodelforrapidtransitsystemthecaseofkaohsiungcirclelinelrtprojectphase1 AT shaotzukao jiéyùnxìtǒngcǎitǒngbāomóshìduìyúqìyuēzhíxíngzhītàntǎoyǐgāoxiónghuánzhuàngqīngguǐjiéyùnjiànshèdìyījiēduànwèilì AT gāoshàocí jiéyùnxìtǒngcǎitǒngbāomóshìduìyúqìyuēzhíxíngzhītàntǎoyǐgāoxiónghuánzhuàngqīngguǐjiéyùnjiànshèdìyījiēduànwèilì AT shaotzukao studyofcontractimplementationindesignbuildmodelforrapidtransitsystemthecaseofkaohsiungcirclelinelrtprojectphase1 AT gāoshàocí studyofcontractimplementationindesignbuildmodelforrapidtransitsystemthecaseofkaohsiungcirclelinelrtprojectphase1 |
_version_ |
1719122264551587840 |