Excessive influence of the Campus Building main transformer design- A University
碩士 === 國立宜蘭大學 === 電機資訊學院碩士在職專班 === 103 === Electrical distribution system capacity over design is very popular in university campus. The excess transformer capacity not only increases initial capital cost but also endures higher Hysteresis loss in transformer core (iron loss) throughout transformer...
Main Authors: | Ming-Liang Li, 李明亮 |
---|---|
Other Authors: | Han-Ching Kuo |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/cen93g |
Similar Items
-
An aerial view of Northeastern University's main campus.
Published: () -
A Study of campus Sign Systems - A Case Study of NTU Main campus in Taipei
by: Ming Kai Li, et al.
Published: (2010) -
MainStage: Building Active Listening Space on UC Campus
by: Downs, Marco Vicente
Published: (2009) -
TEMPERATURE MAPPING OF PETRA CHRISTIAN UNIVERSITY MAIN CAMPUS SURABAYA
by: JUNIWATI Anik, et al.
Published: (2015-07-01) -
Aerial view of Northeastern University's main campus from the south.
Published: ()