Overall Effectiveness Analysis of Dian Bao Flood Detention Pond on Gang Shan Region

碩士 === 高苑科技大學 === 土木工程研究所 === 103 === Ministry of Economic Affairs to effectively improve the flooding problem, since 2005 Provision 8 years 80 billion NT dollars special budget to provide acceleration to improve flood disaster prevention planning to cope with the growing problem of extreme weathe...

Full description

Bibliographic Details
Main Authors: YEH CHENG CHIEH, 葉正傑
Other Authors: Chia Chyi Chang
Format: Others
Language:zh-TW
Published: 2015
Online Access:http://ndltd.ncl.edu.tw/handle/55772793835222916960
id ndltd-TW-103KYIT0015009
record_format oai_dc
spelling ndltd-TW-103KYIT00150092017-01-14T04:15:25Z http://ndltd.ncl.edu.tw/handle/55772793835222916960 Overall Effectiveness Analysis of Dian Bao Flood Detention Pond on Gang Shan Region 典寶滯洪池對岡山地區之整體效益分析 YEH CHENG CHIEH 葉正傑 碩士 高苑科技大學 土木工程研究所 103 Ministry of Economic Affairs to effectively improve the flooding problem, since 2005 Provision 8 years 80 billion NT dollars special budget to provide acceleration to improve flood disaster prevention planning to cope with the growing problem of extreme weather caused by the recent flood disasters. Kaohsiung City, Kaohsiung County Government is against the original area of low-lying areas where flooding is easy to actively seek the central government budget for flood control in order to solve a long-term residents in low-lying areas of pain, avoid living in flood nightmare being. Gangshan regional governance through setting Dian Bao Hung Chi, has been effective in improving the flooding situation. In this paper, Dian Bao Creek detention pond after completion, after several typhoons and storms hit, Gangshan region of floods arising from conduct economic analysis, to understand the rule of the flood pool set whether planning objectives. Research shows that only the land value has gained 46 percent, the report estimates more than 10 percent of the planning nearly tripled. Completion date, nor heard any flooding disaster. Verifiable planning and design of the foot detention pond is quite correct, and suggested that the era of post-detention pond early planning for municipal building should be. Chia Chyi Chang 張家齊 2015 學位論文 ; thesis 62 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 高苑科技大學 === 土木工程研究所 === 103 === Ministry of Economic Affairs to effectively improve the flooding problem, since 2005 Provision 8 years 80 billion NT dollars special budget to provide acceleration to improve flood disaster prevention planning to cope with the growing problem of extreme weather caused by the recent flood disasters. Kaohsiung City, Kaohsiung County Government is against the original area of low-lying areas where flooding is easy to actively seek the central government budget for flood control in order to solve a long-term residents in low-lying areas of pain, avoid living in flood nightmare being. Gangshan regional governance through setting Dian Bao Hung Chi, has been effective in improving the flooding situation. In this paper, Dian Bao Creek detention pond after completion, after several typhoons and storms hit, Gangshan region of floods arising from conduct economic analysis, to understand the rule of the flood pool set whether planning objectives. Research shows that only the land value has gained 46 percent, the report estimates more than 10 percent of the planning nearly tripled. Completion date, nor heard any flooding disaster. Verifiable planning and design of the foot detention pond is quite correct, and suggested that the era of post-detention pond early planning for municipal building should be.
author2 Chia Chyi Chang
author_facet Chia Chyi Chang
YEH CHENG CHIEH
葉正傑
author YEH CHENG CHIEH
葉正傑
spellingShingle YEH CHENG CHIEH
葉正傑
Overall Effectiveness Analysis of Dian Bao Flood Detention Pond on Gang Shan Region
author_sort YEH CHENG CHIEH
title Overall Effectiveness Analysis of Dian Bao Flood Detention Pond on Gang Shan Region
title_short Overall Effectiveness Analysis of Dian Bao Flood Detention Pond on Gang Shan Region
title_full Overall Effectiveness Analysis of Dian Bao Flood Detention Pond on Gang Shan Region
title_fullStr Overall Effectiveness Analysis of Dian Bao Flood Detention Pond on Gang Shan Region
title_full_unstemmed Overall Effectiveness Analysis of Dian Bao Flood Detention Pond on Gang Shan Region
title_sort overall effectiveness analysis of dian bao flood detention pond on gang shan region
publishDate 2015
url http://ndltd.ncl.edu.tw/handle/55772793835222916960
work_keys_str_mv AT yehchengchieh overalleffectivenessanalysisofdianbaoflooddetentionpondongangshanregion
AT yèzhèngjié overalleffectivenessanalysisofdianbaoflooddetentionpondongangshanregion
AT yehchengchieh diǎnbǎozhìhóngchíduìgāngshāndeqūzhīzhěngtǐxiàoyìfēnxī
AT yèzhèngjié diǎnbǎozhìhóngchíduìgāngshāndeqūzhīzhěngtǐxiàoyìfēnxī
_version_ 1718408289146896384