The Study of Applying Project Management to the Periodical Fixing Plan of the Specific Steel Company Blast Furnace Plant

碩士 === 國立高雄應用科技大學 === 工業工程與管理系碩士在職專班 === 103 === In 2014, the output value of Taiwan’s steel industry has reached one trillion, two hundred and seventy billion Taiwanese dollars, which account for eight point eight percent of all manufacturing output value. It will be seen from this that steel indus...

Full description

Bibliographic Details
Main Authors: HUNG-JUN LIN, 林宏俊
Other Authors: LAI-WANG WANG
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/29751631390309749754
id ndltd-TW-103KUAS1031036
record_format oai_dc
spelling ndltd-TW-103KUAS10310362016-09-11T04:09:00Z http://ndltd.ncl.edu.tw/handle/29751631390309749754 The Study of Applying Project Management to the Periodical Fixing Plan of the Specific Steel Company Blast Furnace Plant 應用專案管理於鋼鐵公司高爐工場定修計劃 HUNG-JUN LIN 林宏俊 碩士 國立高雄應用科技大學 工業工程與管理系碩士在職專班 103 In 2014, the output value of Taiwan’s steel industry has reached one trillion, two hundred and seventy billion Taiwanese dollars, which account for eight point eight percent of all manufacturing output value. It will be seen from this that steel industry is an important indicator of a nation’s development. Taiwan’s current largest steel company owns in total six blast furnaces, in which the average output of molten iron is about eight thousand ton per day. It is the vital source for providing a variety of steel-manufactured products. The blast furnaces are running continuously twenty-four hours, in which once furnace shut down it will influence the output of molten iron. However, this important equipment needs maintenance. Thus, periodic examine and repair plan becomes critically important. Blast furnace periodic maintenance plan has the following features: short duration of the project, and many schedules and high risk. The project managers are faced with how to use project management approach to finish the periodic maintenance plan under the limited resources within the shortest timescale, and to achieve the required quality, which is really a big challenge of project managers. This study aims to achieve the better performance of using project management approach by applying critical chain project management, via the example of C iron and steel company, to the scheduling program of blast furnaces’ periodic maintenance plan. The purpose of critical chain project management is mainly through the resources control. Firstly, it calculates each activity’s required time based on activity actual needed time to reduce the activity time, and then to add up all activities’ saving time to project buffer time, which also considers the feeding buffer issue. Secondly it uses resources leveling technology to handle the resource-conflicting activities. Lastly, it monitors the consuming level to achieve the purpose of controlling the project progress. Because the use of buffer is a post hoc event, it is short of early warning function. If combined with earned value management’s early warning mechanism, it can provide project manager more time to cope with project problems. The results in this case study show that after applying project management to periodic maintenance plan, the performance of cost and schedule has enhanced significantly, which can provide a reference for planning schedule related managers. LAI-WANG WANG 王來旺 2014 學位論文 ; thesis 51 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 工業工程與管理系碩士在職專班 === 103 === In 2014, the output value of Taiwan’s steel industry has reached one trillion, two hundred and seventy billion Taiwanese dollars, which account for eight point eight percent of all manufacturing output value. It will be seen from this that steel industry is an important indicator of a nation’s development. Taiwan’s current largest steel company owns in total six blast furnaces, in which the average output of molten iron is about eight thousand ton per day. It is the vital source for providing a variety of steel-manufactured products. The blast furnaces are running continuously twenty-four hours, in which once furnace shut down it will influence the output of molten iron. However, this important equipment needs maintenance. Thus, periodic examine and repair plan becomes critically important. Blast furnace periodic maintenance plan has the following features: short duration of the project, and many schedules and high risk. The project managers are faced with how to use project management approach to finish the periodic maintenance plan under the limited resources within the shortest timescale, and to achieve the required quality, which is really a big challenge of project managers. This study aims to achieve the better performance of using project management approach by applying critical chain project management, via the example of C iron and steel company, to the scheduling program of blast furnaces’ periodic maintenance plan. The purpose of critical chain project management is mainly through the resources control. Firstly, it calculates each activity’s required time based on activity actual needed time to reduce the activity time, and then to add up all activities’ saving time to project buffer time, which also considers the feeding buffer issue. Secondly it uses resources leveling technology to handle the resource-conflicting activities. Lastly, it monitors the consuming level to achieve the purpose of controlling the project progress. Because the use of buffer is a post hoc event, it is short of early warning function. If combined with earned value management’s early warning mechanism, it can provide project manager more time to cope with project problems. The results in this case study show that after applying project management to periodic maintenance plan, the performance of cost and schedule has enhanced significantly, which can provide a reference for planning schedule related managers.
author2 LAI-WANG WANG
author_facet LAI-WANG WANG
HUNG-JUN LIN
林宏俊
author HUNG-JUN LIN
林宏俊
spellingShingle HUNG-JUN LIN
林宏俊
The Study of Applying Project Management to the Periodical Fixing Plan of the Specific Steel Company Blast Furnace Plant
author_sort HUNG-JUN LIN
title The Study of Applying Project Management to the Periodical Fixing Plan of the Specific Steel Company Blast Furnace Plant
title_short The Study of Applying Project Management to the Periodical Fixing Plan of the Specific Steel Company Blast Furnace Plant
title_full The Study of Applying Project Management to the Periodical Fixing Plan of the Specific Steel Company Blast Furnace Plant
title_fullStr The Study of Applying Project Management to the Periodical Fixing Plan of the Specific Steel Company Blast Furnace Plant
title_full_unstemmed The Study of Applying Project Management to the Periodical Fixing Plan of the Specific Steel Company Blast Furnace Plant
title_sort study of applying project management to the periodical fixing plan of the specific steel company blast furnace plant
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/29751631390309749754
work_keys_str_mv AT hungjunlin thestudyofapplyingprojectmanagementtotheperiodicalfixingplanofthespecificsteelcompanyblastfurnaceplant
AT línhóngjùn thestudyofapplyingprojectmanagementtotheperiodicalfixingplanofthespecificsteelcompanyblastfurnaceplant
AT hungjunlin yīngyòngzhuānànguǎnlǐyúgāngtiěgōngsīgāolúgōngchǎngdìngxiūjìhuà
AT línhóngjùn yīngyòngzhuānànguǎnlǐyúgāngtiěgōngsīgāolúgōngchǎngdìngxiūjìhuà
AT hungjunlin studyofapplyingprojectmanagementtotheperiodicalfixingplanofthespecificsteelcompanyblastfurnaceplant
AT línhóngjùn studyofapplyingprojectmanagementtotheperiodicalfixingplanofthespecificsteelcompanyblastfurnaceplant
_version_ 1718383670490824704