Generator Planning and Installation of Cogeneration Systems

碩士 === 國立高雄應用科技大學 === 電機工程系博碩士班 === 103 === Taiwan possesses scarce indigenous energy resources and imports most of its necessary energy resources from abroad. Constructing cogeneration equipment is one of the key measures for enabling effective energy use and compensating for insufficient elect...

Full description

Bibliographic Details
Main Authors: Shuan-Shih Chang, 張栓誌
Other Authors: Tsung-En Lee
Format: Others
Language:zh-TW
Published: 2015
Online Access:http://ndltd.ncl.edu.tw/handle/68tsfu
Description
Summary:碩士 === 國立高雄應用科技大學 === 電機工程系博碩士班 === 103 === Taiwan possesses scarce indigenous energy resources and imports most of its necessary energy resources from abroad. Constructing cogeneration equipment is one of the key measures for enabling effective energy use and compensating for insufficient electricity supply. In addition, the government promotes an energy policy of distributed power generation, which includes the use of cogeneration equipment. Therefore, determining a method by which to select suitable generator systems that can maximize the economic benefits of cogeneration systems is crucial. According to domestic environmental policies, this study proposed a plan to establish generator systems in cogeneration plants. This plan was developed on the basis of process expansion and involved determining generator capacity according to the steam and electricity load requirements in the plant. Furthermore, methods of inspection, maintenance, and commissioning were explained. Finally, an operation test was conducted. The results of selected systems were compared and analyzed to verify the efficiency of power generation, thereby acquiring a cogeneration system that fulfills qualification requirements and facilitates effective energy use and cost reduction.