Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering
碩士 === 台灣首府大學 === 工業管理學系研究所 === 103 === The main points of enterprise focus on cost management, production management, capital management, stock management and quality and quantity management, but capital management is the weak link. The company which focus on raising turnover rate of stock and cost...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/43918298815076251757 |
id |
ndltd-TW-103DWU00041001 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-103DWU000410012016-10-23T04:12:35Z http://ndltd.ncl.edu.tw/handle/43918298815076251757 Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering 以Silver-Meal 啟發式法分析生產排程在可允許缺貨下之成本估計 Kang, Chun Ta 康峻達 碩士 台灣首府大學 工業管理學系研究所 103 The main points of enterprise focus on cost management, production management, capital management, stock management and quality and quantity management, but capital management is the weak link. The company which focus on raising turnover rate of stock and cost down with the minimum price will get more profit than the company which focus on goods and material of reserves. Others with negative comment think that the mass order with the minimum price doest not ensure to make the most profit. When the company can accept stock out and consider to purchase some or all of the same products from other company they can access Silver-Meal Heuristic. in order to decide the best production timing and production. It can reach the minimum of production management costs. This research according to Single-Line Multi-Stage Flow-shop Production System and Economic Ordering Quantity(EOQ) of the cost estimate (includes self-production and outside-purchasing). EOQ is Control Group, and Simulating Silver-Meal Heuristic is Experimental Group. Moreover, according to the average unit cost of production plan and material demand and compare the difference of the average unit cost between Control Group and Experimental Group. It can access the feasibility if small company draws on Silver-Meal Heuristic for production scheduling and control system. (PSCS) The result of data analysis shows Silver-Meal Heuristic method is better than EOQ. Keywords:Economic Ordering Quantity、Production Scheduling、Silver-Meal Heuristic method Li-Chang Chao 趙豊昌 2015 學位論文 ; thesis 73 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 台灣首府大學 === 工業管理學系研究所 === 103 === The main points of enterprise focus on cost management, production management, capital management, stock management and quality and quantity management, but capital management is the weak link. The company which focus on raising turnover rate of stock and cost down with the minimum price will get more profit than the company which focus on goods and material of reserves. Others with negative comment think that the mass order with the minimum price doest not ensure to make the most profit. When the company can accept stock out and consider to purchase some or all of the same products from other company they can access Silver-Meal Heuristic. in order to decide the best production timing and production. It can reach the minimum of production management costs. This research according to Single-Line Multi-Stage Flow-shop Production System and Economic Ordering Quantity(EOQ) of the cost estimate (includes self-production and outside-purchasing). EOQ is Control Group, and Simulating Silver-Meal Heuristic is Experimental Group. Moreover, according to the average unit cost of production plan and material demand and compare the difference of the average unit cost between Control Group and Experimental Group. It can access the feasibility if small company draws on Silver-Meal Heuristic for production scheduling and control system. (PSCS) The result of data analysis shows Silver-Meal Heuristic method is better than EOQ.
Keywords:Economic Ordering Quantity、Production Scheduling、Silver-Meal Heuristic method
|
author2 |
Li-Chang Chao |
author_facet |
Li-Chang Chao Kang, Chun Ta 康峻達 |
author |
Kang, Chun Ta 康峻達 |
spellingShingle |
Kang, Chun Ta 康峻達 Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering |
author_sort |
Kang, Chun Ta |
title |
Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering |
title_short |
Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering |
title_full |
Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering |
title_fullStr |
Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering |
title_full_unstemmed |
Cost Estimation for a Production Scheduling Using Silver-Meal Based Heuristic Method for the Multi-Item Dynamic Lot Sizing Problem with Permissible Backordering |
title_sort |
cost estimation for a production scheduling using silver-meal based heuristic method for the multi-item dynamic lot sizing problem with permissible backordering |
publishDate |
2015 |
url |
http://ndltd.ncl.edu.tw/handle/43918298815076251757 |
work_keys_str_mv |
AT kangchunta costestimationforaproductionschedulingusingsilvermealbasedheuristicmethodforthemultiitemdynamiclotsizingproblemwithpermissiblebackordering AT kāngjùndá costestimationforaproductionschedulingusingsilvermealbasedheuristicmethodforthemultiitemdynamiclotsizingproblemwithpermissiblebackordering AT kangchunta yǐsilvermealqǐfāshìfǎfēnxīshēngchǎnpáichéngzàikěyǔnxǔquēhuòxiàzhīchéngběngūjì AT kāngjùndá yǐsilvermealqǐfāshìfǎfēnxīshēngchǎnpáichéngzàikěyǔnxǔquēhuòxiàzhīchéngběngūjì |
_version_ |
1718389662089740288 |