Building a Model of RFID Wiring Production Line to Predict Work Time by Multiple Regression Analysis

碩士 === 朝陽科技大學 === 資訊管理系 === 102 === In the contemporary business environment, small amount of diversity and urgent orders has become a common situation. Enterprises have to facilitate innovative ideas in order to maximize revenue especially during economic turmoil. The overall expense of the firm ha...

Full description

Bibliographic Details
Main Authors: Chun Lin, 林駿
Other Authors: Shu-Ching Wang
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/88344609659884125423
id ndltd-TW-103CYUT0396001
record_format oai_dc
spelling ndltd-TW-103CYUT03960012016-03-11T04:13:44Z http://ndltd.ncl.edu.tw/handle/88344609659884125423 Building a Model of RFID Wiring Production Line to Predict Work Time by Multiple Regression Analysis 以多元迴歸分析法建立RFID打線製程工時預估模型 Chun Lin 林駿 碩士 朝陽科技大學 資訊管理系 102 In the contemporary business environment, small amount of diversity and urgent orders has become a common situation. Enterprises have to facilitate innovative ideas in order to maximize revenue especially during economic turmoil. The overall expense of the firm has become the determining factor to calculate whether a business is profitable or not. Redining standard work time may contribute to the overall quotation of decision-support system, and directly affect the profit of a company. The standard formula to calculate the total cost is: Total Costs = Material Costs + Labor Costs + Manufacturing Costs It is essential to keep in mind that labor costs accounts for the highest expense. Therefore, it is significant to define standard work time in order to drastically reduce expense which will result in higher marginal profit. This research is based on a case provided by RFID (Radio Frequency Identification) manufacturer. The key component is the E-Unit (Inlet), a semi-finished part of the wire bounding process. We analyzed the production data which were collected from the Shop Floor Tracking System (SFT). Then we sorted the information we collected into the following groups: physical properties of elements, the manufacturing process and personal information of the administrator. A Linear Regression Analysis model was built to verify existing standard work time. It also can be a foundation for setting up a new set of standardized work time in the future. This research can also be a model for other department, such as: manufacturing department in employees and product lines management. In conclusion, the outcome of the research will be gradually incorporated into the entire RFID process of our firm to ensure that the necessary adjustments are performed in a timely manner. Shu-Ching Wang Shyi-Ching Liang 王淑卿 梁錫卿 2014 學位論文 ; thesis 86 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 朝陽科技大學 === 資訊管理系 === 102 === In the contemporary business environment, small amount of diversity and urgent orders has become a common situation. Enterprises have to facilitate innovative ideas in order to maximize revenue especially during economic turmoil. The overall expense of the firm has become the determining factor to calculate whether a business is profitable or not. Redining standard work time may contribute to the overall quotation of decision-support system, and directly affect the profit of a company. The standard formula to calculate the total cost is: Total Costs = Material Costs + Labor Costs + Manufacturing Costs It is essential to keep in mind that labor costs accounts for the highest expense. Therefore, it is significant to define standard work time in order to drastically reduce expense which will result in higher marginal profit. This research is based on a case provided by RFID (Radio Frequency Identification) manufacturer. The key component is the E-Unit (Inlet), a semi-finished part of the wire bounding process. We analyzed the production data which were collected from the Shop Floor Tracking System (SFT). Then we sorted the information we collected into the following groups: physical properties of elements, the manufacturing process and personal information of the administrator. A Linear Regression Analysis model was built to verify existing standard work time. It also can be a foundation for setting up a new set of standardized work time in the future. This research can also be a model for other department, such as: manufacturing department in employees and product lines management. In conclusion, the outcome of the research will be gradually incorporated into the entire RFID process of our firm to ensure that the necessary adjustments are performed in a timely manner.
author2 Shu-Ching Wang
author_facet Shu-Ching Wang
Chun Lin
林駿
author Chun Lin
林駿
spellingShingle Chun Lin
林駿
Building a Model of RFID Wiring Production Line to Predict Work Time by Multiple Regression Analysis
author_sort Chun Lin
title Building a Model of RFID Wiring Production Line to Predict Work Time by Multiple Regression Analysis
title_short Building a Model of RFID Wiring Production Line to Predict Work Time by Multiple Regression Analysis
title_full Building a Model of RFID Wiring Production Line to Predict Work Time by Multiple Regression Analysis
title_fullStr Building a Model of RFID Wiring Production Line to Predict Work Time by Multiple Regression Analysis
title_full_unstemmed Building a Model of RFID Wiring Production Line to Predict Work Time by Multiple Regression Analysis
title_sort building a model of rfid wiring production line to predict work time by multiple regression analysis
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/88344609659884125423
work_keys_str_mv AT chunlin buildingamodelofrfidwiringproductionlinetopredictworktimebymultipleregressionanalysis
AT línjùn buildingamodelofrfidwiringproductionlinetopredictworktimebymultipleregressionanalysis
AT chunlin yǐduōyuánhuíguīfēnxīfǎjiànlìrfiddǎxiànzhìchénggōngshíyùgūmóxíng
AT línjùn yǐduōyuánhuíguīfēnxīfǎjiànlìrfiddǎxiànzhìchénggōngshíyùgūmóxíng
_version_ 1718203790153220096