A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates
碩士 === 朝陽科技大學 === 工業工程與管理系 === 104 === The total completion time is an important performance criterion for production schedules. Reducing the total completion time can reduce the number of WIP effectively which can then reduce production costs. This study aims to investigate the identical parallel-m...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/29063764989727808237 |
id |
ndltd-TW-103CYUT0031025 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-103CYUT00310252017-07-30T04:41:06Z http://ndltd.ncl.edu.tw/handle/29063764989727808237 A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates 以分枝界限法求解允許中斷且工件起始時間不同的相同平行機排程問題 LIN,SHU-YEN 林淑雁 碩士 朝陽科技大學 工業工程與管理系 104 The total completion time is an important performance criterion for production schedules. Reducing the total completion time can reduce the number of WIP effectively which can then reduce production costs. This study aims to investigate the identical parallel-machine total completion time scheduling problem with preemption and release times. This problem is denoted by P_m |pmtn,r_i |∑▒C_i , and is proved to be NP-hard. In this study, we present a branch-and- bound algorithm in which the linear program for a given job completion sequence from Kravchenko(2009) and the lower bound from Baptiste (2009) are used along with an upper bound designed by the author. A large number of randomly generated problems are used to evaluate the performance of the proposed algorithm. The upper bound has an average percentage deviation of 0.18%, and it equals to the optimal value for over 80% of the problems. The lower bound has an average percentage deviation of 5.36%. The proposed branch-and- bound algorithm can solve 11x4 problems within a reasonable amount of time. LIAW,CHING-FANG 廖經芳 2016 學位論文 ; thesis 52 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 朝陽科技大學 === 工業工程與管理系 === 104 === The total completion time is an important performance criterion for production schedules. Reducing the total completion time can reduce the number of WIP effectively which can then reduce production costs.
This study aims to investigate the identical parallel-machine total completion time scheduling problem with preemption and release times.
This problem is denoted by P_m |pmtn,r_i |∑▒C_i , and is proved to be NP-hard.
In this study, we present a branch-and- bound algorithm in which the linear program for a given job completion sequence from Kravchenko(2009) and the lower bound from Baptiste (2009) are used along with an upper bound designed by the author. A large number of randomly generated problems are used to evaluate the performance of the proposed algorithm.
The upper bound has an average percentage deviation of 0.18%, and it equals to the optimal value for over 80% of the problems. The lower bound has an average percentage deviation of 5.36%. The proposed branch-and- bound algorithm can solve 11x4 problems within a reasonable amount of time.
|
author2 |
LIAW,CHING-FANG |
author_facet |
LIAW,CHING-FANG LIN,SHU-YEN 林淑雁 |
author |
LIN,SHU-YEN 林淑雁 |
spellingShingle |
LIN,SHU-YEN 林淑雁 A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates |
author_sort |
LIN,SHU-YEN |
title |
A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates |
title_short |
A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates |
title_full |
A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates |
title_fullStr |
A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates |
title_full_unstemmed |
A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates |
title_sort |
branch-and-bound algorithm to minimize total completion time on identical parallel machines for scheduling preemptive jobs with release dates |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/29063764989727808237 |
work_keys_str_mv |
AT linshuyen abranchandboundalgorithmtominimizetotalcompletiontimeonidenticalparallelmachinesforschedulingpreemptivejobswithreleasedates AT línshūyàn abranchandboundalgorithmtominimizetotalcompletiontimeonidenticalparallelmachinesforschedulingpreemptivejobswithreleasedates AT linshuyen yǐfēnzhījièxiànfǎqiújiěyǔnxǔzhōngduànqiěgōngjiànqǐshǐshíjiānbùtóngdexiāngtóngpíngxíngjīpáichéngwèntí AT línshūyàn yǐfēnzhījièxiànfǎqiújiěyǔnxǔzhōngduànqiěgōngjiànqǐshǐshíjiānbùtóngdexiāngtóngpíngxíngjīpáichéngwèntí AT linshuyen branchandboundalgorithmtominimizetotalcompletiontimeonidenticalparallelmachinesforschedulingpreemptivejobswithreleasedates AT línshūyàn branchandboundalgorithmtominimizetotalcompletiontimeonidenticalparallelmachinesforschedulingpreemptivejobswithreleasedates |
_version_ |
1718508472476106752 |