A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates

碩士 === 朝陽科技大學 === 工業工程與管理系 === 104 === The total completion time is an important performance criterion for production schedules. Reducing the total completion time can reduce the number of WIP effectively which can then reduce production costs. This study aims to investigate the identical parallel-m...

Full description

Bibliographic Details
Main Authors: LIN,SHU-YEN, 林淑雁
Other Authors: LIAW,CHING-FANG
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/29063764989727808237
id ndltd-TW-103CYUT0031025
record_format oai_dc
spelling ndltd-TW-103CYUT00310252017-07-30T04:41:06Z http://ndltd.ncl.edu.tw/handle/29063764989727808237 A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates 以分枝界限法求解允許中斷且工件起始時間不同的相同平行機排程問題 LIN,SHU-YEN 林淑雁 碩士 朝陽科技大學 工業工程與管理系 104 The total completion time is an important performance criterion for production schedules. Reducing the total completion time can reduce the number of WIP effectively which can then reduce production costs. This study aims to investigate the identical parallel-machine total completion time scheduling problem with preemption and release times. This problem is denoted by P_m |pmtn,r_i |∑▒C_i , and is proved to be NP-hard. In this study, we present a branch-and- bound algorithm in which the linear program for a given job completion sequence from Kravchenko(2009) and the lower bound from Baptiste (2009) are used along with an upper bound designed by the author. A large number of randomly generated problems are used to evaluate the performance of the proposed algorithm. The upper bound has an average percentage deviation of 0.18%, and it equals to the optimal value for over 80% of the problems. The lower bound has an average percentage deviation of 5.36%. The proposed branch-and- bound algorithm can solve 11x4 problems within a reasonable amount of time. LIAW,CHING-FANG 廖經芳 2016 學位論文 ; thesis 52 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 朝陽科技大學 === 工業工程與管理系 === 104 === The total completion time is an important performance criterion for production schedules. Reducing the total completion time can reduce the number of WIP effectively which can then reduce production costs. This study aims to investigate the identical parallel-machine total completion time scheduling problem with preemption and release times. This problem is denoted by P_m |pmtn,r_i |∑▒C_i , and is proved to be NP-hard. In this study, we present a branch-and- bound algorithm in which the linear program for a given job completion sequence from Kravchenko(2009) and the lower bound from Baptiste (2009) are used along with an upper bound designed by the author. A large number of randomly generated problems are used to evaluate the performance of the proposed algorithm. The upper bound has an average percentage deviation of 0.18%, and it equals to the optimal value for over 80% of the problems. The lower bound has an average percentage deviation of 5.36%. The proposed branch-and- bound algorithm can solve 11x4 problems within a reasonable amount of time.
author2 LIAW,CHING-FANG
author_facet LIAW,CHING-FANG
LIN,SHU-YEN
林淑雁
author LIN,SHU-YEN
林淑雁
spellingShingle LIN,SHU-YEN
林淑雁
A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates
author_sort LIN,SHU-YEN
title A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates
title_short A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates
title_full A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates
title_fullStr A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates
title_full_unstemmed A Branch-and-Bound Algorithm to Minimize Total Completion Time on Identical Parallel Machines for Scheduling Preemptive jobs With Release Dates
title_sort branch-and-bound algorithm to minimize total completion time on identical parallel machines for scheduling preemptive jobs with release dates
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/29063764989727808237
work_keys_str_mv AT linshuyen abranchandboundalgorithmtominimizetotalcompletiontimeonidenticalparallelmachinesforschedulingpreemptivejobswithreleasedates
AT línshūyàn abranchandboundalgorithmtominimizetotalcompletiontimeonidenticalparallelmachinesforschedulingpreemptivejobswithreleasedates
AT linshuyen yǐfēnzhījièxiànfǎqiújiěyǔnxǔzhōngduànqiěgōngjiànqǐshǐshíjiānbùtóngdexiāngtóngpíngxíngjīpáichéngwèntí
AT línshūyàn yǐfēnzhījièxiànfǎqiújiěyǔnxǔzhōngduànqiěgōngjiànqǐshǐshíjiānbùtóngdexiāngtóngpíngxíngjīpáichéngwèntí
AT linshuyen branchandboundalgorithmtominimizetotalcompletiontimeonidenticalparallelmachinesforschedulingpreemptivejobswithreleasedates
AT línshūyàn branchandboundalgorithmtominimizetotalcompletiontimeonidenticalparallelmachinesforschedulingpreemptivejobswithreleasedates
_version_ 1718508472476106752