Summary: | 碩士 === 中原大學 === 電機工程研究所 === 103 === The study is on the fire risk evaluation of a color chemicals factory which has been operating for 25 years. The aging facilities, and the multiple times of expansion and upgradation in the past of facilities are among the main factors to be considered in the fire prevention for Factory A in this study.
In this report, the relative Articles in the Fire Services Act, the Building Technical Regulations, and the Regulations Governing Indoor Wiring Installations, to Factory A have been reviewed. The reviews include the potential risk on the manufacturing process and due to the inadequate existing fire and explosion installation of a color chemicals factory. Based on the reviews, suggestions are made.
A risk assessment table on fire and explosion for color chemicals factory is designed. Through the table, the high-risk items on the process of manufacturing, on the installation of equipments, on the fire-isolation compartment of buildings etc. can be clearly presented. Corresponding to each high-risk item, preventive measures are suggested which are then further classified into short and long-terms according to the cost/effectiveness of the measures. For the short-term measures, details on the suggested improvement are presented, and for the long-term, general suggestions are also made.
|