THE STUDY OF TEST SCHEDULING OPTIMIZATION OF MEMORY MODULE
碩士 === 大同大學 === 工程管理碩士在職專班 === 102 === DRAM is a capital intensive high tech business. Yet the price of DRAM is strongly influenced by cyclical cycles and other factors. For example, if an over-supply occurred, the price dropped sharply. On the other hand, if an over-demand happened, the price escal...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/gjtv87 |
id |
ndltd-TW-102TTU05031040 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-102TTU050310402019-05-15T21:32:55Z http://ndltd.ncl.edu.tw/handle/gjtv87 THE STUDY OF TEST SCHEDULING OPTIMIZATION OF MEMORY MODULE 記憶體模組廠測試產能優化之研究 Wen-fu Tsai 蔡文富 碩士 大同大學 工程管理碩士在職專班 102 DRAM is a capital intensive high tech business. Yet the price of DRAM is strongly influenced by cyclical cycles and other factors. For example, if an over-supply occurred, the price dropped sharply. On the other hand, if an over-demand happened, the price escalated several times. Therefore, to be success in this highly competitive business, it is important to grasp certain characteristics of the memory module industry, namely, high production yield, short lead time and flexible production. In this paper, Theory of Constraints Drum-Buffer-Rope (Drum-Buffer -Rope (Drum-Buffer-Rope; DBR) scheduling method and Advanced Planning and Scheduling System (APS) were used for the test schedule optimization process of the memory module. Results showed that both Work In Process and working hour control were improved significantly. Tsai-Lung Weng Shih-Tang Lin 翁在龍 林世堂 2014 學位論文 ; thesis 77 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 大同大學 === 工程管理碩士在職專班 === 102 === DRAM is a capital intensive high tech business. Yet the price of DRAM is strongly influenced by cyclical cycles and other factors. For example, if an over-supply occurred, the price dropped sharply. On the other hand, if an over-demand happened, the price escalated several times. Therefore, to be success in this highly competitive business, it is important to grasp certain characteristics of the memory module industry, namely, high production yield, short lead time and flexible production.
In this paper, Theory of Constraints Drum-Buffer-Rope (Drum-Buffer
-Rope (Drum-Buffer-Rope; DBR) scheduling method and Advanced Planning and Scheduling System (APS) were used for the test schedule optimization process of the memory module. Results showed that both Work In Process and working hour control were improved significantly.
|
author2 |
Tsai-Lung Weng |
author_facet |
Tsai-Lung Weng Wen-fu Tsai 蔡文富 |
author |
Wen-fu Tsai 蔡文富 |
spellingShingle |
Wen-fu Tsai 蔡文富 THE STUDY OF TEST SCHEDULING OPTIMIZATION OF MEMORY MODULE |
author_sort |
Wen-fu Tsai |
title |
THE STUDY OF TEST SCHEDULING OPTIMIZATION OF MEMORY MODULE |
title_short |
THE STUDY OF TEST SCHEDULING OPTIMIZATION OF MEMORY MODULE |
title_full |
THE STUDY OF TEST SCHEDULING OPTIMIZATION OF MEMORY MODULE |
title_fullStr |
THE STUDY OF TEST SCHEDULING OPTIMIZATION OF MEMORY MODULE |
title_full_unstemmed |
THE STUDY OF TEST SCHEDULING OPTIMIZATION OF MEMORY MODULE |
title_sort |
study of test scheduling optimization of memory module |
publishDate |
2014 |
url |
http://ndltd.ncl.edu.tw/handle/gjtv87 |
work_keys_str_mv |
AT wenfutsai thestudyoftestschedulingoptimizationofmemorymodule AT càiwénfù thestudyoftestschedulingoptimizationofmemorymodule AT wenfutsai jìyìtǐmózǔchǎngcèshìchǎnnéngyōuhuàzhīyánjiū AT càiwénfù jìyìtǐmózǔchǎngcèshìchǎnnéngyōuhuàzhīyánjiū AT wenfutsai studyoftestschedulingoptimizationofmemorymodule AT càiwénfù studyoftestschedulingoptimizationofmemorymodule |
_version_ |
1719117218077212672 |