The study of evaluating residence defer development project on co-construction

碩士 === 國立臺灣科技大學 === 營建工程系 === 102 === When construction corporations gain the data of land through some brokers, they usually consider either purchasing the land directly for self-development or signing a joint development contract with the landowners. Since self-development and co-construction have...

Full description

Bibliographic Details
Main Authors: Ping-che Chiang, 江秉哲
Other Authors: Ching-hwang Wang
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/55517903425860978235
id ndltd-TW-102NTUS5512098
record_format oai_dc
spelling ndltd-TW-102NTUS55120982016-03-09T04:30:59Z http://ndltd.ncl.edu.tw/handle/55517903425860978235 The study of evaluating residence defer development project on co-construction 合建住宅專案延遲開發價值分析之研究 Ping-che Chiang 江秉哲 碩士 國立臺灣科技大學 營建工程系 102 When construction corporations gain the data of land through some brokers, they usually consider either purchasing the land directly for self-development or signing a joint development contract with the landowners. Since self-development and co-construction have its advantages and disadvantages separately, choosing which development way is depend on the different circumstances. For example, when companies’ financial position is allowable and the future market is expected well, construction corporations will choose to wait strategically for better development time, on the contrary, when the market looks poor, they will choose to abandon the plan. The two describing above are similar to the concept of option to defer and option to abandon in real options. Therefore, this study uses the evaluation model of deferral development in the research plan built up by our laboratory to assess the project’s profits and risks on self-development, and further using the concept of real options to establish the evaluation model of deferral development under the condition of co-construction. We assume that the value of the development project conform to Geometric Brownian Motion (GBM) to simulate the uncertain situation of real estate investment project. And, we use the sharing proportion of 0.3 to 0.5 which is commonly used in practical realm to proceed with the risk- benefit assessment on co-construction. By this way we can find out the profits of the developer and the landowners under different sharing proportion. Finally, we carry on the comparison analysis to assist managers in formulating the optimal development strategies. Ching-hwang Wang 王慶煌 2014 學位論文 ; thesis 76 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 營建工程系 === 102 === When construction corporations gain the data of land through some brokers, they usually consider either purchasing the land directly for self-development or signing a joint development contract with the landowners. Since self-development and co-construction have its advantages and disadvantages separately, choosing which development way is depend on the different circumstances. For example, when companies’ financial position is allowable and the future market is expected well, construction corporations will choose to wait strategically for better development time, on the contrary, when the market looks poor, they will choose to abandon the plan. The two describing above are similar to the concept of option to defer and option to abandon in real options. Therefore, this study uses the evaluation model of deferral development in the research plan built up by our laboratory to assess the project’s profits and risks on self-development, and further using the concept of real options to establish the evaluation model of deferral development under the condition of co-construction. We assume that the value of the development project conform to Geometric Brownian Motion (GBM) to simulate the uncertain situation of real estate investment project. And, we use the sharing proportion of 0.3 to 0.5 which is commonly used in practical realm to proceed with the risk- benefit assessment on co-construction. By this way we can find out the profits of the developer and the landowners under different sharing proportion. Finally, we carry on the comparison analysis to assist managers in formulating the optimal development strategies.
author2 Ching-hwang Wang
author_facet Ching-hwang Wang
Ping-che Chiang
江秉哲
author Ping-che Chiang
江秉哲
spellingShingle Ping-che Chiang
江秉哲
The study of evaluating residence defer development project on co-construction
author_sort Ping-che Chiang
title The study of evaluating residence defer development project on co-construction
title_short The study of evaluating residence defer development project on co-construction
title_full The study of evaluating residence defer development project on co-construction
title_fullStr The study of evaluating residence defer development project on co-construction
title_full_unstemmed The study of evaluating residence defer development project on co-construction
title_sort study of evaluating residence defer development project on co-construction
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/55517903425860978235
work_keys_str_mv AT pingchechiang thestudyofevaluatingresidencedeferdevelopmentprojectoncoconstruction
AT jiāngbǐngzhé thestudyofevaluatingresidencedeferdevelopmentprojectoncoconstruction
AT pingchechiang héjiànzhùzháizhuānànyánchíkāifājiàzhífēnxīzhīyánjiū
AT jiāngbǐngzhé héjiànzhùzháizhuānànyánchíkāifājiàzhífēnxīzhīyánjiū
AT pingchechiang studyofevaluatingresidencedeferdevelopmentprojectoncoconstruction
AT jiāngbǐngzhé studyofevaluatingresidencedeferdevelopmentprojectoncoconstruction
_version_ 1718202469193875456