Investigation on the interface management during the process oftransportation and hoisting of heavy and over-size equipment inpower plant construction
碩士 === 國立臺灣科技大學 === 建築系 === 102 === In power plant construction, the transportation of heavy and over-size equipment will result in significant influence on roads and bridges. The selection of the transportation route and the ways to deal with the bridges on the route or traffic obstacles are the i...
Main Authors: | Yi-Heng Chang, 張義亨 |
---|---|
Other Authors: | Ching-Yuan Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/48347593255385062503 |
Similar Items
-
Improved Design of Hoisting Equipment with Permanent Magne
by: S. S. Stoyanova, et al.
Published: (2010-02-01) -
Dynamic Modeling and Structural Analysis of a Heavy Duty Hoist Transmission
by: Shao-kuei Chang, et al.
Published: (2011) -
Hoist scheduling for an anodizing plant at an extrusion company
by: Alaa Jameel Alsaffar, et al.
Published: (2020-01-01) -
Effect of Hoisting Load on Transverse Vibrations of Hoisting Catenaries in Floor Type Multirope Friction Mine Hoists
by: Jiannan Yao, et al.
Published: (2016-01-01) -
Increasing existing mechanical hoisting capacity with supplementary hydraulic hoisting
by: Zhou, Huaizu
Published: (2014)