Causes of Delay in Road and Bridge Construction Projects in Vietnam

碩士 === 國立臺灣大學 === 土木工程學研究所 === 102 === In Road and Bridge construction projects, delay could be defined as the time overrun either beyond completion date specified in a contract, or beyond the date that the parties agreed upon for delivery of a project. It is a project slipping over its planned sche...

Full description

Bibliographic Details
Main Authors: Nguyen Van Son, 阮云山
Other Authors: Prof. Luh-Maan Chang
Format: Others
Language:en_US
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/38949375414532352930
id ndltd-TW-102NTU05015098
record_format oai_dc
spelling ndltd-TW-102NTU050150982016-03-09T04:24:19Z http://ndltd.ncl.edu.tw/handle/38949375414532352930 Causes of Delay in Road and Bridge Construction Projects in Vietnam 越南道路與橋樑專案工程工期延宕因子分析之研究 Nguyen Van Son 阮云山 碩士 國立臺灣大學 土木工程學研究所 102 In Road and Bridge construction projects, delay could be defined as the time overrun either beyond completion date specified in a contract, or beyond the date that the parties agreed upon for delivery of a project. It is a project slipping over its planned schedule and is considered as common problem in construction projects. To the owner, delay means loss of revenue through lack of production facilities and rent-able space or a dependence on present facilities. In some cases, to the contractor, delay means higher overhead costs because of longer work period, higher material costs through inflation, and due to labor cost increases. Completing projects on time is an indicator of efficiency, but the construction process is subject to many variables and unpredictable factors, which result from many sources. These sources include the performance of parties, resources availability, environmental conditions, involvement of other parties, and contractual relations. However, it rarely happen that a project is completed within the specified time. The main purpose of this study is to identify the delay factors on road and bridge projects completion. A questionaire survey was conducted to solicit the causes of delay from clients, consultants, and contractors. This study indentified 5 most important causes of delay from a list of 39 different causes of delay. Five most important causes were: Slow land acquisition, Price fluctuation, Delay in progress payment by Owner, Poor site management &; supervision by Contractor, Financial difficulties of Contractor. Finally, some solutions dealing with project delay problems in construction executing stages are proposed Prof. Luh-Maan Chang 張陸滿教授 2014 學位論文 ; thesis 45 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 土木工程學研究所 === 102 === In Road and Bridge construction projects, delay could be defined as the time overrun either beyond completion date specified in a contract, or beyond the date that the parties agreed upon for delivery of a project. It is a project slipping over its planned schedule and is considered as common problem in construction projects. To the owner, delay means loss of revenue through lack of production facilities and rent-able space or a dependence on present facilities. In some cases, to the contractor, delay means higher overhead costs because of longer work period, higher material costs through inflation, and due to labor cost increases. Completing projects on time is an indicator of efficiency, but the construction process is subject to many variables and unpredictable factors, which result from many sources. These sources include the performance of parties, resources availability, environmental conditions, involvement of other parties, and contractual relations. However, it rarely happen that a project is completed within the specified time. The main purpose of this study is to identify the delay factors on road and bridge projects completion. A questionaire survey was conducted to solicit the causes of delay from clients, consultants, and contractors. This study indentified 5 most important causes of delay from a list of 39 different causes of delay. Five most important causes were: Slow land acquisition, Price fluctuation, Delay in progress payment by Owner, Poor site management &; supervision by Contractor, Financial difficulties of Contractor. Finally, some solutions dealing with project delay problems in construction executing stages are proposed
author2 Prof. Luh-Maan Chang
author_facet Prof. Luh-Maan Chang
Nguyen Van Son
阮云山
author Nguyen Van Son
阮云山
spellingShingle Nguyen Van Son
阮云山
Causes of Delay in Road and Bridge Construction Projects in Vietnam
author_sort Nguyen Van Son
title Causes of Delay in Road and Bridge Construction Projects in Vietnam
title_short Causes of Delay in Road and Bridge Construction Projects in Vietnam
title_full Causes of Delay in Road and Bridge Construction Projects in Vietnam
title_fullStr Causes of Delay in Road and Bridge Construction Projects in Vietnam
title_full_unstemmed Causes of Delay in Road and Bridge Construction Projects in Vietnam
title_sort causes of delay in road and bridge construction projects in vietnam
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/38949375414532352930
work_keys_str_mv AT nguyenvanson causesofdelayinroadandbridgeconstructionprojectsinvietnam
AT ruǎnyúnshān causesofdelayinroadandbridgeconstructionprojectsinvietnam
AT nguyenvanson yuènándàolùyǔqiáoliángzhuānàngōngchénggōngqīyándàngyīnzifēnxīzhīyánjiū
AT ruǎnyúnshān yuènándàolùyǔqiáoliángzhuānàngōngchénggōngqīyándàngyīnzifēnxīzhīyánjiū
_version_ 1718200525962346496